COSC 153 Exam QUASTION AND
ANSWER 2024-2025(GRADING A+)

Successful project definition (correct answer)Meeting owner's requirements for aesthetics,
function, cost, quality, and time, while ensuring fair contractor profit

Stages of Design (correct answer)Programming, feasibility, conceptual design, design
development, construction documents, and as-builts

Project close-out (correct answer)The final stages of a project, including punchout, substantial
completion, final inspection, certificate of occupancy, commissioning, and final documentation

On-site project team (correct answer)Supported by office management in estimating, contract
administration, accounting, job costing, and payroll, including superintendents and field
engineers

Substantial completion (correct answer)When all punch list work is finished, and the owner can
occupy or take possession of the new facility

Notice to proceed (correct answer)Defines the official start of the project

Members of the team (correct answer)Superintendent, assistant superintendent, field engineer

Management vs leadership (correct answer)Managing things and leading people, respectively

Effective speaking (correct answer)Involves asking for specifics, giving examples, watching for
nonverbal cues, and summarizing key information

Effective listening (correct answer)Involves stopping talking, giving others a chance to talk,
paraphrasing, assuring understanding, and showing respect and concern

Cost models (correct answer)Developed from previously built projects to create a historical cost
database for estimating similar projects

Conceptual estimating (correct answer)Estimating function performed at different design stages
to maintain the overall budget number established in the cost model

Constructability reviews (correct answer)Assessing how buildable something is, considering
quality, value, code compliance, schedule, sustainability, and energy efficiency

Geschreven voor

Instelling
COSC 153
Vak
COSC 153

Documentinformatie

Geüpload op
8 oktober 2024
Aantal pagina's
2
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€12,38
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
yobramuturi

Maak kennis met de verkoper

Seller avatar
yobramuturi Northern Kentucky University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
0
Lid sinds
1 jaar
Aantal volgers
0
Documenten
180
Laatst verkocht
-

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen