100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

Business and Finance Exam two Questions and Answers 2024

Beoordeling
-
Verkocht
-
Pagina's
9
Cijfer
A+
Geüpload op
23-09-2024
Geschreven in
2024/2025

Business and Finance Exam two

Instelling
Florida Business And Finance
Vak
Florida business and Finance









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Florida business and Finance
Vak
Florida business and Finance

Documentinformatie

Geüpload op
23 september 2024
Aantal pagina's
9
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Business and Finance Exam two

All of the following are normally required for a loan application. - answerBGA 317

According to BGA, the only reasonable way to assign overhead is in proportion to what?
- answerDirect labor hours
BGA 228

Previously unrecognized error or omission in the contract documents resulted in
damages on a project. According to AIA-A201, the contractor is; - answernot liable to
the architect or the owner
AIA 201, 3.2.3

CPM and PERT are methods of construction ___________. - answerScheduling
CM 10-57

According to AIA-A401, when must the contractor make good on such deficiencies? -
answerIf the contractor fails within five business days after receipt of written notice from
the contractor to commence and continue correction of such default or neglect.
AIA 4O1, 3.5

According to the CM, the square footage method of estimating is not recommended for
_______________. - answerCost-plus contracts
CM 10-12

What is it mean by discounts on a loan? - answera one time charge made as a
percentage of a loan normally deducted from the amount of the loan
CM 3-74

To become valid a change order must be signed by the __________. - answerArchitect,
owner, and contractor
AIA 201, 15.1.3.1

A change order is issued which changes the quantities of a material covered by a unit
price in the original contract. According to AIA-A201, what price adjustment, is any can
be made? - answerthe unit price can be adjusted equitably in either the contractor or
owners favor
AIA 201, 9.1.2

What portion of the contract documents consist of the written requirements for
materials, equipment, construction systems, standards and workmanship for the work,
and performance or related services? - answerspecifications

, AIA 201, 1.16

What can a contractor determine at the beak even-point? - answerthe least amount of
sales needed to break even, assuming costs and expenses remain reasonably
constant.
178,179 BGA

A contractor computes the percentage of gross profit to sales volume over a number of
months. The contractor finds that gross profit is decreasing in relationship to sales. Of
the factors listed below, which is most likely explanation? - answerA) not enough
volume of work
B) sales prices are too high
C) lack of control costs
D) material thefts are decreasing
C 272 BGA

A contractor will complete a project in 2 years. At the end of the first year, annual gross
receipts were $8,500,000. What is the amount that the gross receipts for the second
year cannot equal or exceed in order to use completed contract method of accounting?
- answer10,000,000
BGA 25

According to AIA-A201, all the following could be cause for an architect to withhold
certification of payment except _________________. - answerdamage done by the
owner to the contractor
AIA 201, 9.5.1

According to BGA, which accounting method is the most acceptable for recording
income and expenses for large jobs, which last longer than one tax year? -
answerPercentage of completion
BGA 25,26,32

A subcontract has a ''standard form of agreement between contractor and
subcontractor'' with the prime contractor on a project. The subcontractor can terminate
the contract in each situation ....... question 27 - answerAIA 401
14.1

When a change order (which is not construction change directive or a minot change) is
issued, who must sign it? - answerthe contractor,owner, and architect
AIA 201, 7.2.1

Billings that have been mailed out by a firm, but for which payment has not been made,
are called ___________. - answerReceivable
BGA 43-46
€11,92
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
julianah420 Phoenix University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
658
Lid sinds
3 jaar
Aantal volgers
324
Documenten
34090
Laatst verkocht
5 dagen geleden
NURSING,TESTBANKS,ASSIGNMENT,AQA AND ALL REVISION MATERIALS

On this page, you find all documents, package deals, and flashcards offered by seller julianah420

4,3

149 beoordelingen

5
101
4
20
3
8
2
5
1
15

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen