CMP 101 Final Exam Questions and Answers All Correct What are the components of the construction contract? - Primary Specifications - Secondary Specifications - None of these - General Specifications - Plans and Specifications - Answer-Plans and Specifications Which of the following construction plans will show light fixtures and their switches? - Mechanical - Electrical - None of these - Civil - Architectural - Answer-Electrical A Construction Manager would perform the following functions as a part of 'Monitoring Project Performance' - Ensure that all portable toilets are functioning for workers to use. - Ensure the architect has completed all construction drawings - Ensure the project cost is within owner's budget - Ensure that work orders are given to sub-contractors - Ensure the project is proceeding as per the schedule - Answer-- Ensure the project cost is within owner's budget - Ensure the project is proceeding as per the schedule Details regarding concrete beams that support the loads on the building will be shown on the __________________plans - Architectural - Plumbing - Civil - Structural - Electrical - Answer-Structural Once the owner occupies the home, they can call the contractor to come in and fix any issues as long as the home is under the ________________stage - Commissioning - Final Inspection - Design - Warranty - None of these - Answer-Warranty

Meer zien Lees minder
Instelling
CMP 101
Vak
CMP 101










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CMP 101
Vak
CMP 101

Documentinformatie

Geüpload op
1 september 2024
Aantal pagina's
16
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

CMP 101 Final Exam Questions
and Answers All Correct
What are the components of the construction contract?
- Primary Specifications
- Secondary Specifications
- None of these
- General Specifications
- Plans and Specifications - Answer-Plans and Specifications

Which of the following construction plans will show light fixtures and their switches?
- Mechanical
- Electrical
- None of these
- Civil
- Architectural - Answer-Electrical

A Construction Manager would perform the following functions as a part of 'Monitoring
Project Performance'
- Ensure that all portable toilets are functioning for workers to use.
- Ensure the architect has completed all construction drawings
- Ensure the project cost is within owner's budget
- Ensure that work orders are given to sub-contractors
- Ensure the project is proceeding as per the schedule - Answer-- Ensure the project
cost is within owner's budget
- Ensure the project is proceeding as per the schedule

Details regarding concrete beams that support the loads on the building will be shown
on the __________________plans
- Architectural
- Plumbing
- Civil
- Structural
- Electrical - Answer-Structural

Once the owner occupies the home, they can call the contractor to come in and fix any
issues as long as the home is under the ________________stage
- Commissioning
- Final Inspection
- Design
- Warranty

,- None of these - Answer-Warranty

In order to start pouring concrete for concrete footings, following steps must be
complete:
(SELECT ALL THAT APPLY)
- Installation of CMU foundation wall
- Installation of Floor Joists
- Footing Formwork Installation
- Footing Rebar Installation
- Installation of Underground Utilities
- Excavation - Answer-- Footing Formwork Installation
- Footing Rebar Installation
- Installation of Underground Utilities
- Excavation

Electrical plans are labelled in the title box as _________________for the first electrical
plan:
- A1
- M1
- E1
- P1
- S1 - Answer-E1

In this type of contract, the owner and architect provide the constructor the estimated
quantities of defined items of work.
- Value-Added Contract
- Unit-Price Contract
- Cost-Plus Fee
- Lump-Sum Contract
- None of these - Answer-Unit-Price Contract

The amount that a buyer pays to purchase a house is known as _____________
- Value
- Cost
- None of these
- Price - Answer-Price

Design and Construction Phases can overlap in the following project delivery method
- Integrated Project Delivery
- CM Agency
- At-Risk CM
- All of these
- Design - Build - Answer-All of these

Each site build project is a ________________________.
- duplicate of the last one using the same plans and specs.

, - civil endeavor
- Prototype
- A and B are correct
- A and C are correct - Answer-Prototype


As a construction manager for a road construction project, you would perform the
following tasks:
(Select all that apply)
- Hire skilled workers to perform the construction work
- Manage the finances to ensure the project makes profit.
- Operate all road building equipment
- Ensure the project is completed on time - Answer-- Hire skilled workers to perform the
construction work
- Manage the finances to ensure the project makes profit.
- Ensure the project is completed on time

For CMP101, what are the 2 types of construction?
- Building and Non-building construction
- Residential and Commercial construction - Answer-Building and Non-building
construction

GC is an acronym for which one of the following?
- Generic Construction
- General Contractor
- Genoa City
- General Construction
- None of these - Answer-General Contractor

On a NON-RESIDENTIAL construction project, the Owner may directly hire the
following entities:
(SELECT ALL THAT APPLY)
- Electrical Engineer
- Architect
- Masonry Contractor
- Prime Contractor
- Construction Manager - Answer-- Architect
- Construction Manager

On a residential construction project from the following construction activities, what
activity would be performed first
- Backfilling around foundation
- Installing Formwork for foundation
- Does not matter - Either one of these can be performed first.
- Pouring concrete for foundation
- Excavation for foundation - Answer-Excavation for foundation
€11,59
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Scholarsstudyguide nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
782
Lid sinds
3 jaar
Aantal volgers
475
Documenten
15262
Laatst verkocht
5 dagen geleden
NURSING

Here you will find everything you need in nursing Assignments, EXAMS AND TESTBANKS. For students who want to see results twice as fast. I strive for my content to be of the highest quality. Always leave a review after purchasing any document so as to make sure our customers are 100% satisfied.

3,9

164 beoordelingen

5
87
4
21
3
26
2
6
1
24

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen