Post Award & Contracts
Miller |Act |1935 |- |ANSWERS✔✔Federal |Government |passed |bond |requiring |payment |and |
performance |bonds |on |all |public |works, |what |year?
Brooks |Bill |1972 |- |ANSWERS✔✔Bill |directing |A/E's |selected |on |qualifications, |what |year?
Clinger |Cohen |Act/Defense |Procurement |Reform |Act |1996 |- |ANSWERS✔✔Allows |all |federal |
agencies |to |utilize |Design-Build. |Prior |to |that |no |enabling |legislation |existed |allowing |Design-Build.
Standard |of |Care |- |ANSWERS✔✔The |level |of |quality |that |any |average |Design |Professional |would |be |
able |to |perform |given |the |circumstances.
Design |Bid |Build |- |ANSWERS✔✔Slowest |Project |Delivery |method, |linear |in |nature, |prescriptive |
(owner |knows |what |they |want),
Multi |Prime |- |ANSWERS✔✔Project |Delivery |- |Many |contracts |through |Owner
CM |at |Risk |- |ANSWERS✔✔Project |Delivery |method |allowing |the |contractor |to |come |on |board |very |
early |in |design |for |preconstruction |services |yet |maintains |separation |between |Designer |and |Builder |
contractually.
Design |Build |- |ANSWERS✔✔Fastest |Project |Delivery |method, |fast |tracking |possible |overlapping |
design |with |construction |utilizing |incremental |packages.
Low |Bid |- |ANSWERS✔✔Procurement |Method |- |Most |Familiar
Negotiated |(Qualifications |Based) |- |ANSWERS✔✔Procurement |Method |- |Common |for |A/E
, Best |Value |- |ANSWERS✔✔Procurement |Method |- |Qualifications |and |Price
Sole |Source |- |ANSWERS✔✔Procurement |Method |- |Direct
Lump |Sum |- |ANSWERS✔✔Contract |Format |w/ |agreed |upon |fixed |price
Cost |Plus |Fee |- |ANSWERS✔✔Contract |Format |- |contractor |reimbursed |for |actual |cost |plus |an |agreed
|upon |percentage
GMP |(Guaranteed |Maximum |Price) |- |ANSWERS✔✔Contract |Format |- |Combines |Cost-Plus |& |
Lump-Sum, |contractor |reimbursed |for |actual |cost |plus |a |fee |only |up |to |a |certain |amount.
Unit |Price |- |ANSWERS✔✔Contract |Format |- |cost |per |piece
Target |Price |- |ANSWERS✔✔Contract |Format |- |established |cost/benchmark |determined |jointly |by |
project |team.
Trust, |Flexibility |- |ANSWERS✔✔Successful |Design |Build |requires |_____ |& |_______ |between |
participants
Hammurabi |- |ANSWERS✔✔Singular |responsibility |for |both |design |& |construction |was |first |codified |
by |____
Bridging |Documents |- |ANSWERS✔✔Owner |provided |items |such |as |20% |design |or |more |and |
provides |prescriptive |specs |at |RFP.
Spearin |Doctrine |- |ANSWERS✔✔Owner |is |responsible |for |implied |warranties |in |the |sufficiency |of |
the |specifications.
Performance |Requirements |- |ANSWERS✔✔____ |____ |should |identify |end |results.