100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Overig

BTEC Unit 9 Project Management Assignment Project Initiation

Beoordeling
-
Verkocht
-
Pagina's
59
Geüpload op
27-08-2024
Geschreven in
2024/2025

Hi, I have attached my personal assignment made from college in the year for distinction received the certificate from BTEC as verification and gone through Turnitin with low percentage. All the assignments attached are clear and well written along with custom images made by myself and from website research. It will be really helpful for someone that needs all the assignments together and I do have from the other units as well the course that I have done was called L3 BTEC National Diploma in Information Technology 23-24 I hope these assignments will help you as much as I was looking for help when I was making them

Meer zien Lees minder
Instelling
Vak











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Study Level
Publisher
Subject
Course

Documentinformatie

Geüpload op
27 augustus 2024
Aantal pagina's
59
Geschreven in
2024/2025
Type
Overig
Persoon
Onbekend

Onderwerpen

Voorbeeld van de inhoud

Unit 9
Project Management
Assignment 2
Project Initiation

BY:
Student Number:
Course: Level 3 IT Year 2

,Assignment 1 – Concepts of programing


Author: | Course: IT Level 3 Year 2 (MIT3DITMP.2324)


Assignment Brief

BTEC Assignment Brief
Qualification BTEC Level 3 Extended Diploma in Information Technology
Unit number and title Unit 9: IT Project Management
B: Carry out a project initiation for an IT project
Learning aim(s) (For
C: Carry out the planning, execution, monitoring and
NQF only)
controlling of an IT project, using an appropriate methodology
Assignment title Project Management in action




You have recently been recruited by a new software
Vocational Scenario or
development company as a trainee project manager. You have
Context
been asked to manage your first software development project.


You have been asked to project manage the development of a
software solution (the software solution will be developed for
Unit 8 – Games Development).
You need to:
• Research and evaluate two possible solutions to the IT
problem, identifying and evaluating the project risks and
constraints and suggest viable methods of controlling
the risks.
• Prepare a feasibility study (including an introduction to
Task 1
the project, overall description, a requirements
specification and success criteria) and select a preferred
solution.
• Project manage the development of the software
solution, including the planning, execution, monitoring
and control of the project. You need to perform the
project management processes in a consistent and
effective manner using an appropriate methodology. You
should include evidence of:




Author: | Course: IT Level 3 Year 2 (MIT3DITMP.2324)
1

,Assignment 1 – Concepts of programing


Author: | Course: IT Level 3 Year 2 (MIT3DITMP.2324)


o Project phasing, dividing up the user
requirements.
o Use of typical project management processes
such as the development of risks, issues and
tasks, prioritising of work, management of
barriers or constraints, regular meetings, budget
and resource control.


Checklist of evidence • Evaluation of two possible solutions
required • Evidence of research into two different solutions
• Feasibility study
• Evidence of project management planning, monitoring
and control of the development activities


Criteria covered by this task:
Unit/Criteria
To achieve the criteria, you must show that you are able to:
reference
Evaluate consistently and comprehensively at least two researched
BC.D2 and realistic solutions to an IT problem on a given theme and justify
using logical chains of reasoning a preferred solution.
Perform consistently and effectively appropriate project management
BC.D3
processes to implement an IT-based project.
Assess consistently at least two adequately researched solutions to an IT
B.M2
problem on a given theme and recommend a preferred solution.
Perform soundly and consistently appropriate project management
C.M3
processes to implement an IT-based project.
Research with some inconsistencies an IT problem, based on a given
B.P3
theme and scope out at least two alternative solutions.
Prepare with some inconsistencies a feasibility study on an IT project and
B.P4
select a preferred solution.
Plan with some inconsistencies and/or omissions the implementation of an
C.P5
IT project.
Execute with some inconsistencies and/or omissions the implementation of
C.P6
an IT project.
Monitor and control with some inconsistencies and/or omissions the
C.P7
implementation of an IT project.




Author: | Course: IT Level 3 Year 2 (MIT3DITMP.2324)
2

, Assignment 1 – Concepts of programing


Author: | Course: IT Level 3 Year 2 (MIT3DITMP.2324)



Sources of information
to support you with Lawton, I. PRINCE2 Made Simple, P2MS Press, 2015. 978-
this Assignment 0992816339
Cole,R. and Scotcher, E. Brilliant Agile Project Management: A
Practical Guide to Using Agile, Scrum and Kanban, Pearson
2015. 978-1292063560
Newton, R. Project Management Step by Step: How to Plan and
Manage a Highly Successful Project, Pearson 2016. 978-
1292142197


Other assessment e.g., work sheets, risk assessments, case study
materials attached to
this Assignment Brief




Contents

Assignment Brief ......................................................................................................................................................... 1
Introduction ................................................................................................................................................................... 4
Research and Evaluation of Potential Solutions ................................................................................................. 5
Solution 1 ................................................................................................................................................................... 6
Solution Risk ........................................................................................................................................................... 12
Solution Risk Mitigation ................................................................................................................................... 13
Solution 2 ................................................................................................................................................................. 13


Author: | Course: IT Level 3 Year 2 (MIT3DITMP.2324)
3
€20,12
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
VadimCordonean

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
VadimCordonean South Thames College – Merton Campus
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
0
Lid sinds
1 jaar
Aantal volgers
0
Documenten
25
Laatst verkocht
-
Complete BTEC Diploma Assignments and Notes - 2024 Edition

Unlock your potential with high-quality assignments and notes from a recent BTEC Diploma graduate in the UK. This collection covers the entire course, including detailed assignments, study guides, and exam notes for all modules. Perfect for current students seeking a reliable resource to boost their grades and understanding. Each document is meticulously crafted to meet BTEC criteria and reflects the latest curriculum. Save time, improve your work, and gain insights from someone who has successfully completed the course. Ideal for anyone looking to excel in their BTEC studies!

Lees meer Lees minder
0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen