Capital budgets are the funds associated with using and maintaining the asset. - False Answer: pg. 514 (Operating budgets are the funds associated with using and maintaining the asset) Working with a system developer can be a good option when the health care organization's needs are highly predictable or commonplace. - ️️False Answer: pg. 228 (Working with a system developer can be a good option when the health care organization's needs are highly uncertain or unique) 8. The final summary report developed by the project steering committee should include everything but? a. Systems goals and criteria b. Cost-benefit analysis c. Final recommendation and ranking of vendors d. Project repository - ️️Project repository One of the first steps in the system acquisition process is to: a. Defining project objectives and scope of analysis b. Determine system goals c. Screen the marketplace and review vendor profiles d. Establish a project steering committee and appoint project manager - ️️Establish a project steering committee and appoint project manager What is NOT an advantage to contracting with an Application Service Provider (ASP) to host an EMR? a. Rapid deployment b. Fixed costs c. Customization d. 24/7 technical support - ️️Customization The ideal project steering committee consists of how many members? a. 3-4 b. 5-6 c. 10-12 d. 20-25 - ️️5-6 The phase of the system development life cycle where all alternatives are considered, a cost-benefit analysis is done, a system is selected, and vendor negotiations are finalized is known as: a. Planning and analysisb. Design c. Implementation d. Evaluation and support - ️️Design The four phases of the system development life cycle in sequential order are: a. Planning and analysis, implementation, design, support and evaluation b. Support and evaluation, implementation, planning and analysis, design c. Design, implementation, planning and analysis, support and evaluation d. Planning and analysis, design, implementation, support and evaluation - ️️Planning and analysis, design, implementation, support and evaluation Once the project steering committee has been established, one of the first things it should is to: a. Define project goals b. Determine system requirements c. Develop an RFP d. Hold vendor demonstrations - ️️Define project goals What is the final step of the system acquisition process where expectations are outlined and performance requirements are determined with the vendor? a. Vendor demonstrations b. Vendor analysis c. Contract negotiations d. Site visits - ️️Contract negotiations What is an example of a research organization that produces market analysis reports listing and describing vendors that provide EHR systems? a. HIMSS b. AMIA c. ONC d. KLAS - ️️KLAS 10. The system acquisition process consists of what two phases of the systems development life cycle: a. Planning and Analysis, Design b. Implementation, Support and Evaluation c. Support and Evaluation, Planning and Analysis d. Design, Implementation - ️️Planning and analysis, design The primary focus of the planning and analysis phase is on the business problem or the organization's strategy, independent of any technology that can or will be used. - ️️True It is generally advisable to have two or three vendors in the final ranking and recommendations made by the project steering committee: - ️️TrueAn RFP might be used when the health care organization is considering only a small group of vendors or products or when it is still in the exploratory phase. - ️️False Answer: pg. 225 (An RFI might be used when the health care organization is considering only a small group of vendors or products or when it is still in the exploratory phase) After reviewing vendor RFPs and evaluating their product demonstrations, the steering committee should prepare a summary report that includes their final recommendation. - ️️False Answer: pg. 231 (After reviewing the vendor's RFPs and evaluating their product demonstration, it is advisable to make site visits and check references) Concurrently with the establishment of project goals, the project steering committee should conduct its first cursory review of the EHR marketplace. - ️️True The use of scripts can ensure that all vendors are evaluated on the same basic or functionality during demonstrations and should be adhered to. - ️️True System acquisition refers to the process that occurs from the time the decision is made to select a new system until the time the system has been fully implemented - ️️False Answer: pg. 210 (System acquisition refers to the process the occurs from the time the decision is made to select a new system until the time the contract has been negotiated and signed) Answer: pg. 232 (The total cost of ownership should factor in support costs and the costs of resources needed to implement and support the system) All vendor requests and communication should be channeled through the project steering committee to manage vendor access to organizational leadership. - ️️True One of the first activities necessary in implementing any new system is: a. Workflow and process analysis b. Install system components c. Conversion of data d. Staff training - ️️Workflow and process analysis IT staff plays the most crucial role in what phase of system implementation? a. Workflow and process analysis b. Install system components c. Conversion of data d. Staff training - ️️Install system componentsWhat are the fundamental activities that should occur during any system implementation? a. Organize implementation team and identify project champion b. Determine project scope and expectations c. Establish and institute project plan d. All of the above - ️️All the above

Meer zien Lees minder
Instelling
BTE 450
Vak
BTE 450











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
BTE 450
Vak
BTE 450

Documentinformatie

Geüpload op
22 augustus 2024
Aantal pagina's
43
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

BTE 450 Exam 2
Capital budgets are the funds associated with using and maintaining the asset. - False

Answer: pg. 514 (Operating budgets are the funds associated with using and maintaining the asset)


Working with a system developer can be a good option when the health care
organization's needs are highly predictable or commonplace. - ✔️✔️False
Answer: pg. 228 (Working with a system developer can be a good option when the
health care organization's needs are highly uncertain or unique)


8. The final summary report developed by the project steering committee should include
everything but?
a. Systems goals and criteria
b. Cost-benefit analysis
c. Final recommendation and ranking of vendors
d. Project repository - ✔️✔️Project repository

One of the first steps in the system acquisition process is to:
a. Defining project objectives and scope of analysis
b. Determine system goals
c. Screen the marketplace and review vendor profiles
d. Establish a project steering committee and appoint project manager - ✔️✔️Establish
a project steering committee and appoint project manager

What is NOT an advantage to contracting with an Application Service Provider (ASP) to
host an EMR?
a. Rapid deployment
b. Fixed costs
c. Customization
d. 24/7 technical support - ✔️✔️Customization

The ideal project steering committee consists of how many members?
a. 3-4
b. 5-6
c. 10-12
d. 20-25 - ✔️✔️5-6

The phase of the system development life cycle where all alternatives are considered, a
cost-benefit analysis is done, a system is selected, and vendor negotiations are
finalized is known as:
a. Planning and analysis

,b. Design
c. Implementation
d. Evaluation and support - ✔️✔️Design

The four phases of the system development life cycle in sequential order are:
a. Planning and analysis, implementation, design, support and evaluation
b. Support and evaluation, implementation, planning and analysis, design
c. Design, implementation, planning and analysis, support and evaluation
d. Planning and analysis, design, implementation, support and evaluation -
✔️✔️Planning and analysis, design, implementation, support and evaluation

Once the project steering committee has been established, one of the first things it
should is to:
a. Define project goals
b. Determine system requirements
c. Develop an RFP
d. Hold vendor demonstrations - ✔️✔️Define project goals

What is the final step of the system acquisition process where expectations are outlined
and performance requirements are determined with the vendor?
a. Vendor demonstrations
b. Vendor analysis
c. Contract negotiations
d. Site visits - ✔️✔️Contract negotiations

What is an example of a research organization that produces market analysis reports
listing and describing vendors that provide EHR systems?
a. HIMSS
b. AMIA
c. ONC
d. KLAS - ✔️✔️KLAS

10. The system acquisition process consists of what two phases of the systems
development life cycle:
a. Planning and Analysis, Design
b. Implementation, Support and Evaluation
c. Support and Evaluation, Planning and Analysis
d. Design, Implementation - ✔️✔️Planning and analysis, design

The primary focus of the planning and analysis phase is on the business problem or the
organization's strategy, independent of any technology that can or will be used. -
✔️✔️True

It is generally advisable to have two or three vendors in the final ranking and
recommendations made by the project steering committee: - ✔️✔️True

,An RFP might be used when the health care organization is considering only a small
group of vendors or products or when it is still in the exploratory phase. - ✔️✔️False
Answer: pg. 225 (An RFI might be used when the health care organization is
considering only a small group of vendors or products or when it is still in the
exploratory phase)

After reviewing vendor RFPs and evaluating their product demonstrations, the steering
committee should prepare a summary report that includes their final recommendation. -
✔️✔️False
Answer: pg. 231 (After reviewing the vendor's RFPs and evaluating their product
demonstration, it is advisable to make site visits and check references)


Concurrently with the establishment of project goals, the project steering committee
should conduct its first cursory review of the EHR marketplace. - ✔️✔️True

The use of scripts can ensure that all vendors are evaluated on the same basic or
functionality during demonstrations and should be adhered to. - ✔️✔️True

System acquisition refers to the process that occurs from the time the decision is made
to select a new system until the time the system has been fully implemented -
✔️✔️False
Answer: pg. 210 (System acquisition refers to the process the occurs from the time the
decision is made to select a new system until the time the contract has been negotiated
and signed)

Answer: pg. 232 (The total cost of ownership should factor in support costs and the
costs of resources needed to implement and support the system)

All vendor requests and communication should be channeled through the project
steering committee to manage vendor access to organizational leadership. - ✔️✔️True

One of the first activities necessary in implementing any new system is:
a. Workflow and process analysis
b. Install system components
c. Conversion of data
d. Staff training - ✔️✔️Workflow and process analysis

IT staff plays the most crucial role in what phase of system implementation?
a. Workflow and process analysis
b. Install system components
c. Conversion of data
d. Staff training - ✔️✔️Install system components

, What are the fundamental activities that should occur during any system
implementation?
a. Organize implementation team and identify project champion
b. Determine project scope and expectations
c. Establish and institute project plan
d. All of the above - ✔️✔️All the above

It is reasonable to expect that the hardware, software, and network will likely need to be
replaced in how many years as advances are made in technology?
a. 1-2 years
b. 5-7 years
c. 3-10 years
d. 15 years - ✔️✔️3 -10 years

Ensuring sufficient staff are on hand and setting up mechanisms for reporting and
correcting problems are all activities associated with which phase of the implementation
plan?
a. Staff training
b. Conversion of data
c. Workflow and process analysis
d. Preparation for go-live date - ✔️✔️Preparation for go-live date

Who would be the best person to serve as system champion for the implementation of a
CPOE system?
a. A nurse
b. A physician
c. CIO
d. CEO - ✔️✔️A physician

What was NOT identified as one of the unintended consequences that implementation
teams should plan for and consider when implementing CPOE?
a. More work or new work
b. New kinds of errors
c. Dependence on the system
d. Patient dissatisfaction - ✔️✔️Patient dissatisfaction

The main concern with using the train the trainer approach is that:
a. The trainer may leave the institution
b. The trainer may not be effective
c. The training process relies on a vendor
d. Training takes time away from the trainers primary role - ✔️✔️The trainer may leave
the institution

The most ideal way to deliver technical support to users during the implementation
phase is by:
a. Providing local support in-house
€7,53
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Brainarium Delaware State University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1826
Lid sinds
2 jaar
Aantal volgers
1043
Documenten
22338
Laatst verkocht
2 dagen geleden

3,8

317 beoordelingen

5
147
4
60
3
54
2
16
1
40

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen