Product Owner/Product Manager (POPM) SAFe 4.6 Exam Questions and Answers
Product Owner/Product Manager (POPM) SAFe 4.6 Exam Questions and Answers Product Manager Role - Correct Answer ️️ -1.Market/customer Facing 2. Identifies market needs 3. Owns vision and roadmaps, pricing, licensing and ROI 4.Drives PI objectives 5. Establish feature description, Benefit Hypothesis, AC 6. Drives Releases and PIs Continuous Delivery Pipeline - Correct Answer ️️ -Continuous Exploration Continuous Integration Continuous Delivery Release on Demand 4 Critical Errors of Phase-gate Milestones - Correct Answer ️️ -1. Decisions by siloed functions that do not build the system 2. Early decision with false feasibility 3. Assumes a point solution exists - not flexible to change 4. Large batches of code, etc are error prone and delay feedback Set-Based Design or Set-Based Concurrent Engineering - Correct Answer ️️ - Consider multiple designs at start, then eliminate weaker options at integration learning points until converge to one design. Nine SAFe Principles - Correct Answer ️️ -1. Economic View 2. Apply systems thinking 3. Assume variability and change 4. Fast increments 5. Milestones on evaluation of working systems 6. Visualize and limit WIP 7. Cadence 8. Unlock intrinsic motivation 9. Decentralized decision making Epic - Correct Answer ️️ -A container for a Solution development initiative large enough to require analysis, the definition of a MVP and financial approval before implementation. Multiple PIs. Epic owner - Correct Answer ️️ -Responsible for driving individual Epics from identification, through the kanban systems and analysis process, to the go/no-go decision making process, and when accepted for implementation, working with the Release Train to initiate the development activities necessary to realize the benefits of the epic. This is a role - not a job title. Types of Epics - Correct Answer ️️ -Business Enabler Architectural Runway - Correct Answer ️️ -existing code, hardware components, etc., that technically enable near-term business features Portfolio Kanban - Correct Answer ️️ -The SAFe portfolio Kanban system is used primarily to identify and manage the flow of epics that affect the course of action for value streams and the Agile Release Trains (ARTs) that realize them. States of Portfolio Kanban - Correct Answer ️️ -Funnel Review Analysis Portfolio Backlog Implementing Done Result of Epic Review - Correct Answer ️️ -Preliminary estimates of opportunity, effort and cost of delay. Result of Epic analysis - Correct Answer ️️ -LEAN business case Parts of the Epic Hypothesis Statement - Correct Answer ️️ -Value Statement Business Outcomes Hypothesis Leading Indicators NFRs Two Types of Value Streams - Correct Answer ️️ -Operational Value Stream - creates the product which makes the money. Development Value Stream - creates supporting technology and tools for Operational Value Streams Lead Time - Correct Answer ️️ -The time from trigger to the value delivery in a Value Stream. Value Streams - Correct Answer ️️ -Series of steps an org. uses to build solutions that provide continuous flow of value to a customer. Core Values of SAFe - Correct Answer ️️ -Built-in qualit
Geschreven voor
- Instelling
- SAFe POPM
- Vak
- SAFe POPM
Documentinformatie
- Geüpload op
- 6 juni 2024
- Aantal pagina's
- 22
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
product ownerproduct manager popm safe 46 exam
Ook beschikbaar in voordeelbundel