100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Traffic Supervisor Exam Questions and Correct Answers Latest Version 2024/2025 (100%Verified).

Beoordeling
-
Verkocht
-
Pagina's
45
Cijfer
A+
Geüpload op
30-05-2024
Geschreven in
2023/2024

Traffic Supervisor Exam Questions and Correct Answers Latest Version 2024/2025 (100%Verified). Is a shadow vehicle used in all traffic zones? A. True B. False - False The shadow vehicle is occupied whenever workers are in the work area. A. True B. False - False What class one light is the shadow vehicle equipped with? A. Flashing Yellow Light B. Oscillating Yellow Light C. Yellow Strobe Light D. All of the above - All of the above When may cones be substituted for drums? A. Daytime traffic control minimum height 18" B. Daytime traffic control minimum height 28" C. Daytime traffic control minimum height 36" D. Daytime traffic control minimum height 42" - Daytime traffic control minimum height 28" When may cones be substituted for drums? A. Daytime traffic control minimum height 18" B. Daytime traffic control minimum height 28" C. Daytime traffic control minimum height 36" D. Daytime traffic control minimum height 42" - Daytime traffic control minimum height 28" When cones are substituted for drums for nighttime closers, what is the minimum cone height requirement? A. 18" B. 28" C. 36" D. 42" - 42" When cones are substituted for drums at nighttime closer, what is the maximum cone spacing? A. 20' B. 30' Traffic Supervisor Exam Questions and Correct Answers Latest Version 2024/2025 (100%Verified) C. 40' D. 50' - 40' What type of flashing warning lights are required when there is a nighttime lane closer? A. ROAD WORK AHEAD B. LANE CLOSED AHEAD C. A & B D. NONE OF THE ABOVE - ROAD WORK AHEAD & LANE CLOSED AHEAD If there is a lane closure of greater than three days, what is required? A. Work zone dotted lines, 4' in length separated by 10' gaps, shall be provided to identify the merge. B. The appropriate color work zone edge lines shall be applied along the taper and tangent sections. C. All the above D. None of the above - The appropriate color work zone edge lines shall be applied along the taper and tangent sections. Work zone pavement marking that conflict with final traffic lanes shall be temporary paint. A. True B. False - False What are the extra advance warning signs? A. Lane Close Ahead B. Watch for Stopped Traffic C. Road Work Ahead D. All the above - Lane Change Ahead & Watch for Stopped Traffic & Road Work Ahead Is the advisory speed plaque used in all traffic zones? A. True B. False - False When the approach speed limit is 40 mph or less, 36" warning signs may be used. A. True B. False - True Road Work Ahead signs shall be provided on entrance ramps or roadways entering the work limits. A. True B. False - True End Road Work signs are only required for lane closures of more than ______ day. A. 1 B. 2 C. 3 D 4 - 1 Sign spacing should be adjusted to avoid conflict with existing signs, minimum spacing to existing signs shall be 200' for speeds of 45 mph or less and a minimum of 400' for speeds 50 mph or greater. A. True B. False - True The minimum acceptable length for the merge taper shall be determined by _________ the width of the offset by the merge taper rate. A. Subtracting B. Adding C. Divide D. Multiplying - Multiplying The tangent (recovery area) section between the two merge tapers should be 2 times longer of the two merge tapers. A. True B. False - True What is a fundamental principle of temporary traffic control? A. To inconvenience motorists as much as possible so they will find another route. B. To guide and direct motorists through or around the work area as efficiently as possible. C. To make traffic move as slow as possible. D. All of the above are fundamental principles. - To guide and direct motorists through or around the work area as efficiently as possible.

Meer zien Lees minder
Instelling
AISSA
Vak
AISSA











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
AISSA
Vak
AISSA

Documentinformatie

Geüpload op
30 mei 2024
Aantal pagina's
45
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
DoctorReinhad Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2141
Lid sinds
4 jaar
Aantal volgers
1728
Documenten
6004
Laatst verkocht
2 dagen geleden
TOP SELLER CENTER

Welcome All to this page. Here you will find ; ALL DOCUMENTS, PACKAGE DEALS, FLASHCARDS AND 100% REVISED & CORRECT STUDY MATERIALS GUARANTEED A+. NB: ALWAYS WRITE A GOOD REVIEW WHEN YOU FIND MY DOCUMENTS OF SUCCOUR TO YOU. ALSO, REFER YOUR COLLEGUES TO MY ACCOUNT. ( Refer 3 and get 1 free document). AM AVAILABLE TO SERVE YOU ANY TIME. WISHING YOU SUCCESS IN YOUR STUDIES. THANK YOU.

3,6

303 beoordelingen

5
130
4
49
3
56
2
17
1
51

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen