FIREFIGHTER II VDFP FINAL
Skills such as performing a size up and establishing and transferring command are a what skill? - Answer-Firefighter II Firefighter II requirements are through NFPA ______ - Answer-NFPA 1001 __________________ consists of safety, liaison, and information - Answer-Command staff __________________ consists of operations, planning, logistics, and finance - Answer-General staff The IC is responsible for developing the strategies for the _____________________ - Answer-Incident action plan A ______________ usually refers to companies and/or crews working in the same geographic division - Answer-Division The building size, layout, and occupancy are _______________________ - Answer-Special considerations Property conservation in RECEO VS is ___________________ - Answer-Extinguishment, overhaul, ventilation, and salvage The officer on scene may look at survivability profiling prior to searching which is a _______________ analysis - Answer-Risk/benefit The _______________________ and/or occupant is a primary source of information for the incident report - Answer-Property owner ________________________ are often used in incident reports - Answer-Standardized codes Indications that a _____________ is imminent can be the roof separating - Answer-Collapse ___________________ will peel away and/or crack as the wall behind it burns away - Answer-Brick veneer Applying water directly onto the burning material is a _________________ - Answer-Direct attack
Geschreven voor
- Instelling
- FIREFIGHTER II
- Vak
- FIREFIGHTER II
Documentinformatie
- Geüpload op
- 28 mei 2024
- Aantal pagina's
- 5
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
firefighter ii vdfp final