100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

Test Bank For Project Management in Practice, 7th Edition by Meredith & Shafer, All 8 Chapters Covered and Verified

Beoordeling
-
Verkocht
2
Pagina's
140
Cijfer
A+
Geüpload op
25-05-2024
Geschreven in
2024/2025

Test Bank For Project Management in Practice, 7th Edition by Meredith & Shafer, All 8 Chapters Covered and Verified Test Bank For Project Management in Practice, 7th Edition by Meredith & Shafer, All 8 Chapters Covered and Verified Test Bank For Project Management in Practice, 7th Edition by Meredith & Shafer, All 8 Chapters Covered and Verified, TEST BANK For Project Management in Practice, 7th Edition by Jack R. Meredith, Verified Chapters 1 - 8, Complete Newest Version Test bank and solution manual pdf Test bank and solution manual pdf free download Test bank and solution manual pdf download Test bank and solution manual free download Test Bank solutions Test bank nursing stuvia Test bank and solution manual pdf free download studocu Test bank and solution manual pdf download slideshare Test bank and solution manual free download Test Bank online Pdf Test Bank stuvia online Test Bank studocu online Test Bank slideshare online Test Bank PDF Test bank questions and answers Test bank and study guide pdf Test bank nursing Download test banks for free Test bank questions and answers pdf Test Bank PDF Test bank pdf notes Test bank pdf free download Test bank questions and answers pdf Chemistry test bank pdf Download test banks for free Free test banks online Test bank practice test Test bank website Test Bank PDF Test bank quizlet Test bank questions Download test banks for free Test bank nursing Free test banks online Test bank practice test Test Bank book Solution manual pdf free download Solution manual pdf download Solution manual for textbooks free Solution manuals Free solution manual website Popov Solution Manual pdf How to download solution manual of any book Meredith 7th Edition Test Bank Meredith 7th edition test bank pdf Meredith 7th edition test bank answers Meredith 7th edition test bank free Meredith 7th edition test bank answers pdf Meredith 7th edition test bank answers chapter 1 Meredith 7th edition test bank free pdf Meredith 7th edition test bank free download

Meer zien Lees minder
Instelling
Project Management In Practice 7e By Meredith
Vak
Project Management in Practice 7e by Meredith

















Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Gekoppeld boek

Geschreven voor

Instelling
Project Management in Practice 7e by Meredith
Vak
Project Management in Practice 7e by Meredith

Documentinformatie

Geüpload op
25 mei 2024
Aantal pagina's
140
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

TEST BANK
Project Management in Practice,
7th Edition Meredith, Chapter 1 - 8

,TABLE OF CONTENTS


1. CHAPTER 1: THE WORLD OF PROJECT MANAGEMENT


2. CHAPTER 2: THE MANAGER, THE ORGANIZATION, AND THE TEAM


3. CHAPTER 3: PROJECT ACTIVITY AND RISK PLANNING


4. CHAPTER 4: BUDGETING THE PROJECT


5. CHAPTER 5: SCHEDULING THE PROJECT


6. CHAPTER 6: ALLOCATING RESOURCES TO THE PROJECT


7. CHAPTER 7: MONITORING AND CONTROLLING THE PROJECT


8. CHAPTER 8: EVALUATING AND CLOSING THE PROJECT

,Chapter 1: The World of Project Management
True/False
1. A primary purpose of forming projects is to assign the responsibility for
accomplishing some organizational task to a specific person or small group.

Answer: True
Response: See section 1.1 Level:
easy



2. One of the few similarities between project management and general management is
that both exist in the well-defined organizational structure of superior/subordinates
in the overall organization.

Answer: False
Response: See section 1.2 Level:
medium



3. Many recent developments in project management are being driven by changes in
the nature of the American workforce.

Answer: False
Response: See section 1.1 Level:
medium



4. There has been a growing use of projects to achieve an organization’s strategic
goals

Answer: True
Response: See section 1.1 Level:
medium

,5. While general managers have their authority limited to specific areas in the overall
organization, project managers have authority over any activity required by the
project.

Answer: False
Response: See section 1.2
Level: medium



6. Projects are always carried out under conditions of uncertainty.

Answer: True
Response: See section 1.3
Level: easy



7. One can trade-off time and cost when managing a project, but the project’s
technical specifications must be maintained exactly as the client initially specifies.

Answer: False
Response: See section 1.3
Level: medium



8. Nonnumeric project selection methods are only suitable if numeric methods are
not available.

Answer: False
Response: See section 1.5
Level: medium


9. When using financial methods for selecting projects, the payback period is the
simplest and best method to use.

Answer: False
Response: See section 1.5
Level: medium



10 Rank-ordering a large number of projects can be done with a Q-sort.

, Answer: True
Response: See section 1.5
Level: medium



11. A disadvantage of using the payback period method for selecting projects is that it
cannot reflect the time-value of money.

Answer: True
Response: See section 1.5
Level: medium




12. A disadvantage of using the discounted cash flow method (or net present value) for
selecting projects is that it ignores all non-monetary factors associated with the
project except risk.

Answer: True
Response: See section 1.5
Level: medium



13. A disadvantage of using scoring models rather than financial models for selecting
projects is that they cannot include the project’s profitability.

Answer: False
Response: See section 1.5
Level: medium



14. A PM does not need to understand why a project is selected for funding because
he did not initiate the process.

Answer: False
Response: See section 1.5
Level: medium



15. The main distinction between platform and breakthrough projects is that the
former usually depend on existing technology.

, Answer: True
Response: See section 1.6
Level: medium



16. The main distinction between platform and derivative projects is that the latter
depend on existing technology.

Answer: False
Response: See section 1.6
Level: medium




17. One reason for the emphasis on project management is that tasks fit neatly into
business-as-usual.

Answer: False
Response: See section 1.1
Level: easy



18. Programs are subdivisions of projects.

Answer: False
Response: See section 1.1
Level: easy



19. Projects are subdivisions of programs.

Answer: True
Response: See section 1.1
Level: easy



20. A similarity between project management and general management is the
tendency to ―manage by exception.‖

, Answer: False
Response: See section 1.2
Level: medium



21. Project budgets are primarily modifications of budgets for the same activity in the
previous period.

Answer: False
Response: See section 1.2
Level: medium


22. In project management, superior-subordinate relationships are known and lines of
authority are clear.

Answer: False
Response: See section 1.2
Level: medium



23. Having responsibility for the outcome of a project without the authority of rank or
position is common in project management.

Answer: True
Response: See section 1.2
Level: medium



24. Negotiating the purchase of a new car would typically be characterized as win-
win negotiation.

Answer: False
Response: See section 1.2
Level: medium



25. In project management, it is often necessary to trade-off one objective for another.

Answer: True
Response: See section 1.3

, Level: easy




26. A project that is selected because it is necessary for continued operations
exemplifies a sacred cow.

Answer: False
Response: See section 1.5
Level: medium



27. The comparative benefits method is considered a nonnumeric project selection
method.

Answer: True
Response: See section 1.5
Level: medium



28. When using the weighted scoring model, the categories for each scale must be in
equal intervals.

Answer: False
Response: See section 1.5
Level: medium



29. Scoring methods were developed to overcome some of the disadvantages of
simple financial profitability methods.

Answer: True
Response: See section 1.5
Level: medium



30. One limitation of scoring methods is that they can only incorporate quantitative
data.

Answer: False

, Response: See section 1.5
Level: medium



31. As a rule of thumb, the number of factors included in a scoring model should be
at least 10.

Answer: False
Response: See section 1.5
Level: medium



32. Projects success is not determined by the portfolio of projects in an organization.

Answer: False
Response: See section 1.6
Level: medium



33. R&D projects are oriented toward using newly developed technologies or existing
technologies in a new manner.

Answer: True
Response: See section 1.6
Level: medium



34. Projects with deliverables that are incrementally different from existing offerings
are classified as platform projects.

Answer: False
Response: See section 1.6
Level: medium



35. The project manager depends on legitimate authority to gain the cooperation of the many
departments in the organization that may be asked to supply technology, information,
resources and personnel to the project.
Answer: False
Response: See section 1.2
Level: medium

, 36. In the early years of a project when outflows usually exceed inflows, the NPV of the
project for those years will be positive.
Answer: False
Response: See section 1.5
Level: medium




Multiple Choice



37. Which of the following is not a trend in project management?
a) achieving strategic goals
b) improving project effectiveness
c) quasi projects
d) reductive projects
e) achieving routine goals

Answer: d
Response: See section 1.1
Level: medium



38. Which of the following criteria can be included in scoring models for selecting
projects?
a) potential profitability of the project
b) potential impact on the firm’s competitive position
c) the organization’s ability to market the output of a project
d) All of the above can be included
e) only a and b above

Answer: d
Response: See section 1.5
Level: medium



39. If the initial investment is a project is $100,000 and the expected annual net profit
for the project is $20,000, the payback period is:
a) One fifth of a year
b) 4 years
c) 5 years

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
LectHarrison Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1233
Lid sinds
2 jaar
Aantal volgers
318
Documenten
1138
Laatst verkocht
17 uur geleden

3,9

195 beoordelingen

5
91
4
42
3
33
2
5
1
24

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen