100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Overig

MNB2601 ASSESSMENT 4 SEMESTER 1 2024

Beoordeling
-
Verkocht
-
Pagina's
22
Geüpload op
12-05-2024
Geschreven in
2023/2024

MNB2601 ASSESSMENT 4 SEMESTER 1 2024

Instelling
Vak










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
12 mei 2024
Aantal pagina's
22
Geschreven in
2023/2024
Type
Overig
Persoon
Onbekend

Onderwerpen

Voorbeeld van de inhoud

5/12/24, 7:23 PM Assessment 4




MNB2601-24-S1  Welcome Message  Assessment 4

QUIZ




Time left 1:36:18

Question 1
Not yet answered

Marked out of 1.00




For estimation to be effective, a threshold level of confidence must be set. The threshold level is usually decided at the start
of a project.

Which one of the following levels of rigour in the estimation process is generally accepted and has a variance of 25%?


a. conceptual estimation



b. detailed estimation



c. definitive estimation



d. comprehensive estimation



Clear my choice




Question 2
Not yet answered

Marked out of 1.00




In which of the following estimation methods is a probabilistic analysis applied to determine the properties of the estimated
forecast?


a.
Monte Carlo simulation



b.
probabilistic estimation



c.
power series estimation



d.
three-point estimation



Clear my choice




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=19084976&cmid=879516 1/7

,5/12/24, 7:23 PM Assessment 4

Question 3

Not yet answered

Marked out of 1.00




In managing estimates, variance analysis is performed, assuming that sound and reliable estimates were calculated to the
expected level of confidence.

In respect of which of the common causes of variance is a recommendation made to take care in developing and maintaining
the basis of estimates?


a. estimation errors



b. operational issues



c. approved changes



d. ambiguous requirements



Clear my choice




Question 4
Not yet answered

Marked out of 1.00




Which of the following statements concerning the precedence diagramming method (PDM), as a scheduling method, is
incorrect?


a.
PDM does not include the ability to introduce varying constraints.

b.
The tasks are sequenced between the start and finish of the project.

c. All tasks, except the start and the finish, have one or more predecessors and successors: no task is left unattended.

d. Relationships between tasks are indicated by arrows.

Clear my choice




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=19084976&cmid=879516 2/7

, 5/12/24, 7:23 PM Assessment 4

Question 5

Not yet answered

Marked out of 1.00




For estimation to be effective, a threshold level of confidence must be set. The threshold level is usually decided at the start
of a project.

Which one of the following levels of rigour in the estimation process is generally accepted and has a variance of 10%?


a.
detailed estimation



b.
conceptual estimation



c.
definitive estimation



d.
comprehensive estimation



Clear my choice




Question 6
Not yet answered

Marked out of 1.00




The portfolio manager at MFM Manufacturers has to choose between the execution of two competing projects, namely,
project A and project B. The mean-variance rule can be used to choose between these projects. The mean-variance rule
states that an investment in project A will be preferred to an investment in project B, provided that (i) ­______ or (ii) ______.


a.
(i) either the mean expected return on project A exceeds that of project B and the variance of project A is equal to or
less than that of project B; (ii) the mean expected return on project A exceeds or is equal to the expected return on
project B and the variance of project B is greater than that of project A



b. (i) either the mean expected return on project A exceeds that of project B and the variance of project A is equal to or

more than that of project B; (ii) the mean expected return on project A exceeds or is equal to the expected return on
project B and the variance of project B is greater than that of project A



c. (i) either the mean expected return on project A exceeds that of project B and the variance of project A is equal to or
more than that of project B; (ii) the mean expected return on project B exceeds the expected return on project A



d. (i) either the mean expected return on project B exceeds that of project A and the variance of project B is equal to or

more than that of project A; (ii) the mean expected return on project B exceeds or is equal to the expected return on
project A and the variance of project A is greater than that of project B



Clear my choice




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=19084976&cmid=879516 3/7
€2,74
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
tatendamuzavazi financial intelligence
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1261
Lid sinds
4 jaar
Aantal volgers
694
Documenten
819
Laatst verkocht
2 dagen geleden
Financial Intelligence Group

We offer assignment packs and summarized notes with vivid up-to-date examples and illustrations for different commercial and humanities degrees. Our aim is to make the learning process easier for the students in colleges and universities.

3,7

184 beoordelingen

5
76
4
33
3
44
2
10
1
21

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen