100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

CSI CDT Exam Study Guide (questions and answers) 100% solved

Beoordeling
-
Verkocht
-
Pagina's
15
Cijfer
A+
Geüpload op
06-05-2024
Geschreven in
2023/2024

CSI CDT Exam Study Guide (questions and answers) 100% solved Owner - CORRECT ANSWER-Principle stakeholder - initiates project, assumes risk, provides funding AHJ - Authorities Having Jurisdiction - CORRECT ANSWER-Protect public health, safety and welfare Design Team - CORRECT ANSWER-Address planning issues, determine design program, identify codes and regulations, produce procurement and construction documents, administer construction contract, *provide QA/QC procedures* Contractor Team - CORRECT ANSWER-Entity that constructs a facility. Uses management abilities to gather labor forces, subs, and material/product/equipment suppliers Supplier Team - CORRECT ANSWER-Furnishes the materials and products for the facility to be constructed. Fabricator, Distributor, Manufacturer, Supplier. Facility Life Cycle - CORRECT ANSWER-The life cycle of a facility, from concept through construction to use and eventual deconstruction. Project Conception Project Delivery Design Construction Documents Procurement (Bidding/Negotiating/Purchasing) Construction Facility Management Project Conception - CORRECT ANSWER-Transforms the needs of owner into clear concept on which project can be designed. Feasibility Study, Programming, Site Selection, Budgeting. Project Delivery - CORRECT ANSWER-Determine delivery method to be used. Factors - qualifications, experience, capacity, project extent, time requirements. Design - CORRECT ANSWER-Two Phases: schematic design and design development. Deliverables include graphic and written design documents and estimates of project cost. Schematic Design - CORRECT ANSWER-Overall relationships and functions. Site plan and area, general size/shape/massing of elements, elevations and exteriors established, conceptual design criteria identified. Deliverables - schematic drawings, probable cost, preliminary schedules Design Development - CORRECT ANSWER-Technical issues of constructibility and integration of systems and components. Deliverables - Tech information, outline specifications, updated schedule, updated cost estimate. Construction Documents - CORRECT ANSWER-Defined as the written and graphic documents prepared or assembled by the A/E for communicating the project design for construction and administering the construction contract. Construction documents include two major types of documents: Procurement documents and Contract documents. Procurement (Bidding/Negotiating/Purchasing) - CORRECT ANSWER-Acceptance of the contractor's bid or negotiated sum and other conditions will result in award of a contract and commencement of work. Construction - CORRECT ANSWER-Responsibilities: Contractor - perform work, project coordination, comply with project documents. A/E - construction admin, evaluation services, certify application for payment, final inspection of work. Owner - provide information, process payments, approve contract modifications, accept project upon completion. Facility Management - CORRECT ANSWER-During occupancy, owners & facility managers maintain and evaluate the performance of the project and determine suitability for continuing use. OmniClass - CORRECT ANSWER-A multi-table informational framework for organizing information used by the architectural, engineering, and construction industry. UniFormat - CORRECT ANSWER-Uniform classification system for organizing preliminary construction information into a standard order or sequence on the basis of systems or assemblies. Particularly useful in conceptual design. Element Identification. MasterFormat - CORRECT ANSWER-Arranges related construction practices, logical groupings of work results, into a series of divisions. 50 division format. Used for Specifications, data organization, and cost classification. MasterFormat Groups - CORRECT ANSWER-00 Procurement and Contracting Requirement Group Specifications Group - General Requirements 01 - Facility Construction Subgroup (concrete) - Facility Services (plumbing/HVAC) - Site and Infrastructure (Earthwork) - Process Equipment (WW equipment

Meer zien Lees minder
Instelling
CDT
Vak
CDT









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CDT
Vak
CDT

Documentinformatie

Geüpload op
6 mei 2024
Aantal pagina's
15
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

CSI CDT Exam Study Guide (questions and answers) 100% solved Owner - CORRECT ANSWER -Principle stakeholder - initiates project, assumes risk, provides funding AHJ - Authorities Having Jurisdiction - CORRECT ANSWER -Protect public health, safety and welfare Design Team - CORRECT ANSWER -Address planning issues, determine design program, identify codes and regulations, produce procurement and construction documents, administer construction contract, *provide QA/QC procedures* Contractor Team - CORRECT ANSWER -Entity that constructs a facility. Uses management abilities to gather labor forces, subs, and material/product/equipment suppliers Supplier Team - CORRECT ANSWER -Furnishes the materials and products for the facility to be constructed. Fabricator, Distributor, Manufacturer, Supplier. Facility Life Cycle - CORRECT ANSWER -The life cycle of a facility, from concept through construction to use and eventual deconstruction. Project Conception Project Delivery Design Construction Documents Procurement (Bidding/Negotiating/Purchasing) Construction Facility Management Project Conception - CORRECT ANSWER -Transforms the needs of owner into clear concept on which project can be designed. Feasibility Study, Programming, Site Selection, Budgeting. Project Delivery - CORRECT ANSWER -Determine delivery method to be used. Factors - qualifications, experience, capacity, project extent, time requirements. Design - CORRECT ANSWER -Two Phases: schematic design and design development. Deliverables include graphic and written design documents and estimates of project cost. Schematic Design - CORRECT ANSWER -Overall relationships and functions. Site plan and area, general size/shape/massing of elements, elevations and exteriors established, conceptual design criteria identified. Deliverables - schematic drawings, probable cost, preliminary schedules Design Development - CORRECT ANSWER -Technical issues of constructibility and integration of systems and components. Deliverables - Tech information, outline specifications, updated schedule, updated cost estimate. Construction Documents - CORRECT ANSWER -Defined as the written and graphic documents prepared or assembled by the A/E for communicating the project design for construction and administering the construction contract. Construction documents include two majo r types of documents: Procurement documents and Contract documents. Procurement (Bidding/Negotiating/Purchasing) - CORRECT ANSWER -Acceptance of the contractor's bid or negotiated sum and other conditions will result in award of a contract and commencement of work. Construction - CORRECT ANSWER -Responsibilities: Contractor - perform work, project coordination, comply with project documents. A/E - construction admin, evaluation services, certify application for payment, final inspection of work. Owner - provide information, process payments, approve contract modifications, accept project upon completion. Facility Management - CORRECT ANSWER -During occupancy, owners & facility managers maintain and evaluate the performance of the project and determine suitability for continuing use. OmniClass - CORRECT ANSWER -A multi -table informational framework for organizing information used by the architectural, engineering, and construction industry. UniFormat - CORRECT ANSWER -Uniform classification system for organizing preliminary construction information into a standard order or sequence on the basis of systems or assemblies. Particularly useful in conceptual design. Element Identification. MasterFormat - CORRECT ANSWER -Arranges related construction practices, logical groupings of work results, into a series of divisions. 50 division format. Used for Specifications, data organization, and cost classification. MasterFormat Groups - CORRECT ANSWER -00 Procurement and Contracting Requirement Group Specifications Group
€13,68
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
StudyCenter1 Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
221
Lid sinds
2 jaar
Aantal volgers
91
Documenten
3852
Laatst verkocht
1 maand geleden
Nursing school is hard! Im here to simply the information and make it easier!

My mission is to be your LIGHT in the dark. If you"re worried or having trouble in nursing school, I really want my notes to be your guide! I know they have helped countless others get through and thats all i want for YOU! Stay with me and you will find everything you need to study and pass any tests,quizzes abd exams!

4,3

27 beoordelingen

5
18
4
4
3
3
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen