ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions And Answers
ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions And Answers Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - ANS B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False - ANS B. False ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obtaining the first and final portions of the composite sample. Q3. The composite concrete sample must be protected from sun, wind, contamination and rapid evaporation. A. True B. False - ANS A. True ASTM C172 - Para (4.1.2)
Geschreven voor
- Instelling
- ACI Concrete
- Vak
- ACI Concrete
Documentinformatie
- Geüpload op
- 5 april 2024
- Aantal pagina's
- 34
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
aci concrete field testing technician grade 1
Ook beschikbaar in voordeelbundel