BICSI OSP QUESTIONS WITH 100 % CORRECT ANSWERS | VERIFIED
If lead to height ratio is between 1/2 and 3/4 and only 2 or 3 spans the head guy should be_____ than suspension strand. - Answer-One SIze Larger Important set of deliverables - Answer-Design documents OSP cost variance - Answer-10% CSI 27 CSI 28 CSI 31 CSI 33 CSI26 - Answer-Telecommunications electrical safety and security' Earth work Utilities Electrical NAP groupings - Answer-4,6,8,12 4 parts security - Answer-Prevent, Detect,Alarm,Secure 3 components of EMI - Answer-Unbalanced electromagnetic fields of the power system, Coupling between power and telecommunications and susceptibility of the tele system Direct buried cables collects ground strikes with a distance determined by soil resistance typically? - Answer-6.6' to 19.7' A reading of______ ampres is the best possible reading for any bonding conductor, AC should be less than 1A and DC 500 Miliampres - Answer-0Maximum value for 2 point bonding in central offices? - Answer-.1 Ohms Trencher used in soft loamy soils or loose clay soils depths up to 5' 3' for smaller trenchers - AnswerVibratory Trencher used in tight soils, heavy clays or loose rock Depth sup to 5' - Answer-Static Trenchers used in Hardend clay rock soil or adverse conditions - Answer-Rip plow Maximum connector loss reccomended - Answer-.75 DB ____ have individual jackets for each tight buffered fiber.______ has one jacket and is lower cost. - Answer-Breakout, Distribution _______ and ______ are not used after the first 24 binders. - Answer-Violet and slate Load coil designs to counter the effects of capacitance buildup in loop lengths over? - Answer-5.5 KM Baseband cabling used in lengths up to? - Answer-328' Uses a solid polymer that insulates each conducting wire ad is color coded and more resistant to electrical surges and more tolerant to handle than PE-39 has 6 to 3000 Pairs - Answer-PE-89 PE-39 has pair range of? - Answer-25 to 4200 pair What determines the maximum permissible end to end system attenuation in a given fiber link? - Answer-Average transmitter power and receiver sensitivity By subtracting the passive cable system attenuation from link loss budget what value is received? - Answer-System performance margin I CE A - Answer-I= Design C= Insulation type E- Conductor gauge A- Sheath design In planning OSP cabling,__ must be determined for? - Answer-Cable infrastructure Class 7 pole breaking strength - Answer-5335 N (1200Lb)
Geschreven voor
- Instelling
- BICSI OSP
- Vak
- BICSI OSP
Documentinformatie
- Geüpload op
- 16 maart 2024
- Aantal pagina's
- 11
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
bicsi osp
Ook beschikbaar in voordeelbundel