100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

ACI Concrete Field Technician - Grade 1 Exam Questions and Answers 2024

Beoordeling
5,0
(1)
Verkocht
1
Pagina's
15
Cijfer
A+
Geüpload op
01-03-2024
Geschreven in
2023/2024

ACI Concrete Field Technician - Grade 1 Exam Questions and Answers 2024 1. A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing aggregate with particles not exceeding _____ in size, without the need for wet sieving the concrete. - Answer- 2 in. [50 mm] 2. According to ASTM C1064, what is one reason to take the temperature of concrete? - Answer- Verify conformance to a specified requirement for temperature of concrete 3. After completing the strike-off procedure, what must be done before weighing the measure and sample? - Answer- Clean off any excess concrete 4. After consolidation of the final layer, an excess of concrete ____ above the top of the measure is considered optimum. - Answer- 1/8 in. [3 mm] 5. After molding test specimens, you should wait two hours before moving them to the location of initial storage. True or False? - Answer- False; the specimens must be moved within 15 minutes 6. After rodding each layer, what should be done to the measure before adding another layer of concrete? - Answer- Tap the sides of the measure smartly 10 to 15 times with the mallet 7. After the final rodding, the sides of the slump mold should be tapped lightly with the tamping rod. True or False? - Answer- False 8. After the temperature of the concrete is read, what is required? - Answer- Reporting of temperature, record it. Sun, wind, contamination. 9. Air meter bowls used for this test must conform to ASTM _____ and be calibrated for volume according to ASTM _____. - Answer- C231, C29 10. The approximate concrete depth (in vertical distance) after placing the first layer is _____, and the second layer is _____. - Answer- 2 5/8 in. [70 mm], 6 1/8 in. [160 mm ] 11. ASTM Method gives standardized requirements for _____, _____, _____, and _____, of test specimens. - Answer- Making, curing, protecting, transporting. 12. At the end of the procedure, the air meter is _____. - Answer- Disassembled and its contents examined 13. The composite sample for a paving mixer 5 must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - Answer- 5 14. A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - Answer- False 15. The composite samples from a truck mixer must be obtained from the _____ portion of the batch. - Answer- Middle 16. Concrete mixtures with specified strengths of 6000 psi [40 MPa] or greater shall have an initial curing temperature between - Answer- 68 and 78 degrees F [20 and 26 C] 17. The concrete sample must be obtained in accordance with what ASTM method? - Answer- C172 18. The concrete sample must be protected from contamination and _____. - Answer- Rapid evaporation

Meer zien Lees minder
Instelling
ACI
Vak
ACI









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
ACI
Vak
ACI

Documentinformatie

Geüpload op
1 maart 2024
Aantal pagina's
15
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€11,86
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Beoordelingen van geverifieerde kopers

Alle reviews worden weergegeven
8 maanden geleden

5,0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
KatelynWhitman West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1092
Lid sinds
2 jaar
Aantal volgers
482
Documenten
33020
Laatst verkocht
1 dag geleden
Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online& Actual Exam Tests with Confidence. STUDY LIKE A PRO WITH A WELL FORMATTED Q&A MATERIALS.

3,6

238 beoordelingen

5
95
4
38
3
54
2
20
1
31

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen