ACI Test 100% Solved 2024
ACI Test 100% Solved 2024 The total time allowed between obtaining the first and final portions of a composite sample is - Answer-15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) - Answer-F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample - Answer-5 minutes Begin molding test specimens within ______ minutes after obtaining the composite sample - Answer-15 minutes The concrete samples should be protected from - Answer-the sun, wind, and other sources of rapid evaporation, from contamination When test specimens are to be molded, the minimum size of sample obtained is - Answer-28 L (1 ft^3) The primary objective of the sampling process is to obtain a representative sample (T or F) - Answer-T When sampling from a revolving drum truck mixer collect concrete from ______ portions of the batch - Answer-2 or more Wet sieving is performed - Answer-when the concrete contains aggregates larger than appropriate for a test When sampling from a paving mixer it is not acceptable to place 3 small containers on the sub grade in order to obtain the required samples of concrete (T or F) - Answer-F
Geschreven voor
- Instelling
- ACI
- Vak
- ACI
Documentinformatie
- Geüpload op
- 1 maart 2024
- Aantal pagina's
- 8
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
aci test 100 solved 2024
Ook beschikbaar in voordeelbundel