ACI Concrete Practice Exam Questions With 100% Correct Answers 2024/2025
ACI Concrete Practice Exam Questions With 100% Correct Answers 2024/2025 The end of the temperature sensing portion of the temperature measuring device is submerged a minimum of _____ into the freshly mixed concrete - answer3 The temperature measuring device shall be capable of measuring the temperature of freshly mixed concrete from ___ to ___ degrees - answer30, 120 The temperature measuring device should be verified ____ or whenever there is a question of ___ - answerannually, accuracy The temp of concrete can be measured in wheelbarrow - answerTrue The temperature of the concrete can be measured in a wall form - answerTrue A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature - answerTrue What must be done to the sample container prior to sampling concrete - answerWet the container what must be done to the concrete surrounding the temperature measuring device after the device is submerged in concrete. - answerClose the voids surrounding device After temp is taken what must be done after - answerRecord temp The temp is recorded to the nearest - answer1 F How long must the temperature measuring device remain in the freshly mixed concrete? - answer2-5 min According to Test Method C1064/C1064M, what is one reason to take the temperature of concrete? - answerVerify conformance to spec A maximum temperature of freshly mixed concrete is specified in Test Method C1064/C1064M, True or False - answerFalse The sample of concrete used for temp determination must be rodded 25 times, true or false - answerFalse
Geschreven voor
- Instelling
- ACI Concrete
- Vak
- ACI Concrete
Documentinformatie
- Geüpload op
- 25 februari 2024
- Aantal pagina's
- 9
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
aci concrete practice exam questions with 100 cor
Ook beschikbaar in voordeelbundel