100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

CAPM Practice Exam (PMBOK Guide 6th Edition) 2024

Beoordeling
-
Verkocht
-
Pagina's
22
Cijfer
A+
Geüpload op
12-02-2024
Geschreven in
2023/2024

CAPM Practice Exam (PMBOK Guide 6th Edition) 2024 Select the best description of the planning process group The process(es) required to establish the scope of the project, refine the objectives, and define the course of action required to attain the objectives that the project was undertaken to achieve. The process(es) required to establish the scope of the project, refine the objectives, and define the course of action required to include in the project charter The process(es) performed to define a new project or a phase of an existing project by obtaining authorization to start the project or phase. The process(es) required to plan how the project will take place through meetings with project stakeholders. -Answer-The process(es) required to establish the scope of the project, refine the objectives, and define the course of action required to attain the objectives that the project was undertaken to achieve. Which of the following data analysis techniques helps to determine which individual project risks or other sources of uncertainty have the most potential impact on project outcomes? Influence diagrams Decision tree analysis Simulations Sensitivity analysis -Answer-Sensitivity analysis Using the data below, which item is MOST over budget? Item--------PV--------AC--------EV 1--------10,000--------11,000--------10,000 2--------9,000--------8,000--------8,000 3--------8,000--------8,000--------8,000 4-------7,000-------7,000--------5,000 -Answer-Cost Performance Index (CPI) A CPI value of less than 1.0 indicates a cost overrun for work completed. A CPI Value greater than 1.0 indicates a cost under-run of performance to date. CPI = EV / AC Item 4 All of the following are characteristics of the project charter EXCEPT: It formally authorizes the existence of a project. It provides a direct link between the project and the strategic objectives of the organization. It is used primarily to request bids for a project or a specific phase of a project. It provides the project manager with the authority to apply organizational resources to project activities. -Answer-It is used primarily to request bids for a project or a specific phase of a project. Memos and emails are examples of what communication method? Interactive Push Pull Transmit Message -Answer-Push Which of the following contains information on the threats and opportunities that may impact resource planning? Resource Calendar Staff Release Plan Project Organization Chart Risk Register -Answer-Risk Register As the project manager, which of the following is your responsibility as part of the Monitoring and Controlling Process Group? Continuously monitor the work being completed Build team cohesiveness and relationships to both external and internal stakeholders Ensure stakeholder needs are being met in relation with the approved scope Integrate the various parts of the project work into a cohesive whole -Answer- Continuously monitor the work being completed Addressing any risks or potential risks or potential concerns related to stakeholders and anticipating future issues that may be raised by stakeholders are activities that are a part of which project management process

Meer zien Lees minder
Instelling
CAPM
Vak
CAPM










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CAPM
Vak
CAPM

Documentinformatie

Geüpload op
12 februari 2024
Aantal pagina's
22
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
KatelynWhitman West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1103
Lid sinds
2 jaar
Aantal volgers
483
Documenten
34017
Laatst verkocht
21 uur geleden
Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online& Actual Exam Tests with Confidence. STUDY LIKE A PRO WITH A WELL FORMATTED Q&A MATERIALS.

3,6

239 beoordelingen

5
95
4
39
3
54
2
20
1
31

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen