100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

CHC Key Predicted Questions and Correct Answers 2024

Beoordeling
-
Verkocht
-
Pagina's
68
Cijfer
A+
Geüpload op
09-02-2024
Geschreven in
2023/2024

According to NFPA 99-1999, to which branch of the the essential electrical system are the medical gas alarm panels connected? a) Life Safety b) Critical c) Equipment d) Non-essential - a) Life Safety In accordance with the interim Life Safety Measures, when temp fire alarm systems are provided, how often must they be tested? a) Weekly b) Monthly c) Semi-anually d) Quarterly - b) Monthly Which of the following should not be included in a capital budget for replacement of a central chiller? a) Design Fees b) Cost of removal of the old chiller c) Commissioning d) Service Contract - d) Service Contract The emergency PA system has just announced a code blue in the area which you are working. What is the best course of action? a) Evacuate the area in which you are working and leave all tools behind. b) Move al work equipment and tools out of the travel paths and keep travel paths clear. c) Continue to work and advice the the hospital's project manager. d) Evacuate and remove all equipment and tools from the area. - b) Move al work equipment and tools out of the travel paths and keep travel paths clear. An project requres that the piped gas system be shut down and O2 supplied by portable cylinders. A storage area has been set aside for cylinders (23.5 cu ft per cylinder). What is the max number of cylinders that can be stored in the unit? a) 10 b) 12 c) 14 d) 16 - b) 12 Max 300 CF A multiphase project will require you to alter egress patterns for several units, the ICU, TCU, and MICU. In some instances, required exists will lead to an active construction site. What ILSM's are most appropriate. a) Provide temp exit signage in affected areas and monitor egress paths to ensure that they remain clear. b) Develop and identify new exit routes, train staff in affected areas, and increase fire drills. c) Provide temp exit signage, implement a fire watch, and document all activities. d) Provide temp exit signage, notify the fire department, and perform additional fire drills. - b) Develop and identify new exit routes, train staff in affected areas, and increase fire drills. A renovation project is underway on a nursing unit. The egress corridor is 10'6 wide with a 20" WOW in the corridor and ABHR dispensers that project 4" into the corridor. How much of the corridor can be used to store construction supplies. a) As much as 2'6 provided materials are stored between WOW's b) Materials may be stored against the wall to a maximum width of 8". c) No materials may be stored in the corridor. d) As much as 2'2" provided materials are stored between the WOW's - c) No materials may be stored in the corridor. Your estimate is over budget. The owner has expressed a desire to reduce the cost by eliminating the central energy plant and replacing the chillers with direct expansion units. Other than energy efficiency, what other variables should be included in this discussion? a) Projected life, replacement costs, future expansion plans. b) Maintenance and repair costs, salvage value

Meer zien Lees minder
Instelling
CHC
Vak
CHC











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CHC
Vak
CHC

Documentinformatie

Geüpload op
9 februari 2024
Aantal pagina's
68
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€7,45
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
MGRADES Stanford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1070
Lid sinds
1 jaar
Aantal volgers
102
Documenten
68976
Laatst verkocht
1 dag geleden
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3,8

169 beoordelingen

5
73
4
30
3
44
2
8
1
14

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen