100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

SAFe Scrum Master Study Guide 5.0, Complete Solution 2022/2023

Beoordeling
-
Verkocht
-
Pagina's
20
Cijfer
A+
Geüpload op
08-02-2024
Geschreven in
2023/2024

SAFe Scrum Master Study Guide 5.0, Complete Solution 2022/2023 Agile frameworks SAFe Scrum Crystal Kanban eXtreme Programming (XP) Feature-driven development What does a Scrum Master do? - Servant leaders and coaches for an Agile Team. - Help educate team in Scrum, XP, Kanban and SAFe, ensuring the agreed Agile process is being followed. - Help remove impediments and foster an environment for high-performing team dynamics, continuous flow and relentless improvement. - Facilitates team events - Works with RTE to ensure train meets PI objectives - Fosters normalized estimating within the team - Assists the PO in backlog for PI and IP. - Attends scrum of scrum meetings. ART Agile Release Train PO Product Owner Program Increment (PI) Planning A cadence-based, face-to-face event that serves as the heartbeat of the Agile Release Train (ART), aligning all the teams on the ART to a common mission and vision. Innovation and Planning Iteration Occurs every PI and serves multiple purposes. It acts as an estimating buffer for meeting PI objectives, as well as providing dedicated time for innovation, continuing education, and PI planning and Inspect and Adapt (I&A) events. Inspect & Adapt (I&A) A significant event, held at the end of each PI, where the current state of the solution is demonstrated and evaluated by the train. Teams reflect and identify improvement backlog items via a structured, problem-solving workshop Iteration A basic building block of Agile development. Each is a standard, fixed-length timebox, where Agile Teams deliver incremental value in the form of working, tested software and systems. Cycle - Defines, builds, integrates, & test. What is the recommended timebox duration for an Iteration? 2 weeks; however, 1-4 weeks is acceptable, depending on the business context. Who participates in the Inspect & Adapt (I&A) phase? All stakeholders, including: 1. The Agile Teams 2. Release Train Engineer (RTE) 3. System and Solution Architect Engineering 4. Product Management, Business Owners, and others on the Train What results from the I&A phase? Improvement backlog items that go to the Program Backlog for the next PI Planning event 3 parts of I&A PI System Demo Quantitative Measurement Retrospective and Problem-Solving Workshop Purpose of PI System Demo To show all the Features the ART has developed over the course of the PI Leads: PM, PO, System Team Attend: BO, Stakehlders, PM, RTE, SM & Teams PI System Demo Timebox ~1 hr or less What is one primary measurement to be considered in quantitative metrics? Program predictability measure Updated end of inspect & adapt event Retrospective goal To identify whatever issues they would like to address Retrospective objective To identify a few significant problems that the teams can potentially address - What went well, what didn't go well, what can do better next time. PDCA Cycle Plan Do Check Adjust Who facilitates the PI Planning event? Release Train Engineer (RTE) In which iteration does PI Planning take place? Innovation and Planning Iteration __ ________ is essential to SAFe; if you are not doing it, you are not doing SAFe. PI Planning Business Benefits of PI Planning - Establishing face-to-face communication across all team members and stakeholders - Building the social network the ART depends on aligning development to business goals with the business context, vision, and team project PI objectives - Identifying dependencies and fostering cross-team and cross-ART collaboration - Providing the opportunity for "just the right amount of architecture and Lean User Experience (UX) guidance) - Matching demand to capacity, eliminating excess WIP - Fast decision-making PI Planning Inputs Business context Roadmap and vision Top 10 features of the Program Backlog NFRs (Non-functional Requirements) PI Planning Outputs Committed PI objectives (A set of SMART objectives that are created by each team with the business value assigned by the Business Owners) Program board (this highlights the new feature delivery dates, feature dependencies among teams and with other ARTs, and relevant milestones) Plan is the goal 3 Areas of Preparation for a Successful PI Planning Organizational Readiness Content Readiness Facility Readiness Organizational Readiness Strategic alignment and teams trains setup Content Readiness Management and development preparedness Facility Readiness The actual space and logistics for the event Organizational Readiness Considerations Planning scope and context - is the scope (product, system or technology domain) of the planning process understood? Do we know which teams need to plan together? Business alignment - is there reasonable agreement on priorities among Business Owners Agile teams - Do we have Agile teams? Are there dedicated developer and test resources and an identified Scrum Master and Product Owner for the team? Content Readiness Considerations Executive briefing - a briefing that defines the current business context Product vision briefing(s) - briefing(s) prepared by Product Management including the top 10 features in the product backlog Architecture vision briefing - a presentation made by the CTO, Enterprise Architect, or System Architect to communicate new enablers, features, and Nonfunctional Requirements (NFRs) Facility Readiness Considerations Facility - this room must be roomy enough for all attendees, with breakout rooms if necessary Facilities/tech support - these people need to be identified in advance and reachable during setup and testing, and the event itself

Meer zien Lees minder
Instelling
SAFe Scrum Master
Vak
SAFe Scrum Master










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
SAFe Scrum Master
Vak
SAFe Scrum Master

Documentinformatie

Geüpload op
8 februari 2024
Aantal pagina's
20
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TheInstructor NURSING
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
54
Lid sinds
1 jaar
Aantal volgers
30
Documenten
4955
Laatst verkocht
1 week geleden
The Instructor

NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in Nursing and Mathematics. I also have additional knowledge in mathematics-based courses (finance and economics).

3,8

8 beoordelingen

5
4
4
2
3
0
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen