GCSS-Army Watercraft in GCSS-Army Test 1 with Complete Solutions
. When creating an OBSL work order, the 4 low priority list item is selected. b. FALSE 2. When a change is made to the OBSL BOM, a new XML file is received into GCSS-Army via the ______, which results in an update to the existing OBSL BOM. d. SAP Business Workplace 3. The Open Web Service (OWS)/Universal Data Exchange (UDEx) Interface links information from the ______ to GCSS-Army. b. Logistics Support Vessel (LSV) 4. When installing equipment a(n) _____notification must be created. b. D1 Notification 5. The intent of the OBSL work order is to be able to compare the OBSL material requirement quantities with the ______. a. On-hand material quantities 6. The nomenclature for the OBSL work order description is the OBSL, followed by the watercraft vessel ______. c. Advanced Shipment Notifica
Geschreven voor
- Instelling
- GCSS-Army Watercraft in GCSS-Army
- Vak
- GCSS-Army Watercraft in GCSS-Army
Documentinformatie
- Geüpload op
- 19 januari 2024
- Aantal pagina's
- 3
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
gcss army watercraft in gcss army test 1 with comp