Scaled Agile Framework / SAFe Scrum Master Certification Prep (SSM) job sequencing
Scaled Agile Framework / SAFe Scrum Master Certification Prep (SSM) job sequencing the key to economic outcomes WSJF weighted shortest job first How do you calculate WSJF? WSJF = CoD (estimated value) / Duration (time to ship or Job Size) RR risk reduction OE opportunity enablement How to calculate CoD? CoD = User-business value + Time criticality + RR & OE value / Job Size or "Duration" PI program increment NFR non functional requirement 3 Pillars of Scrum transparency, inspection, adaptation Scrum values make these things transparent: process, workflow, progress The 5 SAFe Scrum Values are... courage, focus, openness, commitment, respect SAFe Iteration length 2-4 weeks Team composition does not change during an Iteration, otherwise the ____ is invalid. velocity product owner owns, prioritizes and manages the TEAM backlog team increment a thin vertical slice of functionality Three roles in Agile teams scrum master, product owner, development team Typical development team size in Scrum 3-9 excluding the scrum master and product owner The promise of SAFe Synchronizes alignment, collaboration, and delivery for large numbers of teams 4 core values of SAFe built-in quality, program execution, alignment, transparency 9 SAFe Lean-Agile principles 1. take an economic view 2. apply systems thinking 3. assume variability; preserve options 4. build incrementally with fast, integrated learning cycles 5. base milestones on objective evaluation of working systems 6. visualize and limit WIP, reduce batch sizes, and manage queue lengths 7. apply cadence, synchronize with cross domain planning 8. unlock the intrinsic motivation of knowledge workers 9. decentralize decision making Agile Release Train a virtual organization of 5-12 teams (50-125+) that plans, commits, and executes together program increment duration a fixed timebox with a default of 10 weeks. RTE role acts as chief scrum master for the train product manager owns, defines, and prioritizes the PROGRAM backlog system architect/engineer provides architectural guidance and technical enablement to the teams on the train business owners key stakeholders on the agile release train 4 program events PI planning ART sync System Demo Inspect and Adapt event PI planning timebox 2 days art sync timebox 1 hour system demo timebox 2 hours inspect and adapt event the train reviews and improves its process before the next PI pdca plan, do, check, act PI planning cadence 2 days every 8-12 weeks (10 is typical) Product Management role in PI owns feature priorities Development teams role in PI own story planning and high level estimations Two things every feature has benefit hypothesis and acceptance criteria benefit hypothesis justifies feature implementation cost and provides business perspective when making scope decisions
Geschreven voor
- Instelling
- Scaled Agile Framework / SAFe Scrum Master Certifi
- Vak
- Scaled Agile Framework / SAFe Scrum Master Certifi
Documentinformatie
- Geüpload op
- 19 januari 2024
- Aantal pagina's
- 10
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
scaled agile framework safe scrum master certifi