ICC / UST (With correct solutions)
Corrosion Specialist correct answers designs and certifies cathodic protection system Secondary containment shall be constructed to contain at least the following volumes: correct answers A. 100% of usable capacity of primary where there is only one primary is within the secondary B. 150% of the largest container if there are multiple primary containers in a single secondary Cathodic protection tester will test cathodic protection system within __ months of installation and every __ years thereafter correct answers 6 months 3 years Spill container shall meet the following requirements: correct answers A. If made of metal, exterior wall shall be protected from galvanic corrosion B. Shall have minimum capacity of 5 gallons (19 L) C. Shall have drain valve which allows drainage of the collected spill into the primary container or provide means to keep spill cont empty Overfill prevention shall alert transfer operator when tank is __% full correct answers 90% Flapper Valves shall provide positive shut off when tank is filled to no more than __% capacity correct answers 95% Primary pressurized piping shall be tested for tightness hydrostatically at __% of design operating pressure correct answers 150% Date that all UST systems must have Line Leak Detector installed correct answers November 9,2004 Secondary containment testing shall be done upon ____, __months, and every ___ months or ____ years thereafter correct answers Installation 6 months 36 months or 3 years Owners/ops shall submit SCT results to local agency within ____ days of completion correct answers 30 days All monitoring equipment shall be tested, calibrated, operated, maintained, and certified every ____ months. correct answers 12 months A person conducting UST monitoring equipment certification shall affix tag/sticker on each component and shall include ___ and ___. correct answers Date certified, replaced or repaired Contractor/tank tester's license number
Geschreven voor
- Instelling
- ICC / UST
- Vak
- ICC / UST
Documentinformatie
- Geüpload op
- 7 januari 2024
- Aantal pagina's
- 3
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
corrosion specialist
Ook beschikbaar in voordeelbundel