Module 10 fully solved graded A+ 2023/2024
Module 10Business Continuity Plan (BCP) Refers to a plan that focuses on sustaining an organization’s mission/business processes during and after a disruption. Disaster Recovery Plan (DRP) An information system focused plan designed to restore operability of the target system, application or computer facility infrastructure at an alternate site after an emergency. Brainpower Read More Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:01 / 0:15 Full screen Business Impact Analysis (BIA) Refers to an analysis of an information system's requirements, functions, and interdependencies used to characterize system contingency requirements and priorities in the event of significant disruption. Maximum Tolerable Downtime (MTD) In BIA, represents the total amount of time the system owner/authorizing official is willing to accept for a mission/business process outage. (Sum of RTO and WRT) Recovery Time Objective (RTO) In BIA, defines the maximum amount of time that a system resource can remain unavailable before there is an unacceptable impact on other system resources, supported mission/business processes and MTD. Recovery Point Objective (RPO) In BIA, represent the point in time, prior to a disruption or system outage, to which mission/business process data can be recovered (given the most recent backup copy of the data) after an outage. Work Recovery Time (WRT) In BIA, refers to maximum tolerable amount of time that is needed to verify the system and/or data integrity. This could be, for example, checking the databases and logs, making sure the applications or services are running and are available. Full backup A backup method captures all files on the disk or within the folder selected for backup. However, the time required to perform these type of backups can be lengthy and may cause unnecessary media storage issues. Incremental backup
Geschreven voor
- Instelling
- WRT Certification
- Vak
- WRT Certification
Documentinformatie
- Geüpload op
- 23 december 2023
- Aantal pagina's
- 5
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
module 10
Ook beschikbaar in voordeelbundel