100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

Bus 190 Exam Study

Beoordeling
-
Verkocht
-
Pagina's
7
Cijfer
A+
Geüpload op
17-11-2023
Geschreven in
2023/2024

Exam of 7 pages for the course Bus 190 at Bus 190 (Bus 190 Exam Study)

Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Vak

Documentinformatie

Geüpload op
17 november 2023
Aantal pagina's
7
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Bus 190 Exam Study

Pert stands for = project evaluation and review technique

1) which of the following is NOT a property of all LP problems = a computer program (not sure)
This is correct.

2) a feasible solution to a LP problem = must satisfy all of the problem’s constraints
simultaneously

6) If goal was to construct network where all points are connected & distance between them are
short as possible = Minimal-spanning tree.

7) A line in a network that may represent a path or route is called a = arc

9) Transportation models can be used for which decisions = facility location

10) when using general LP model for transportation problem, if 4 sources and 3 destinations =
There are typically 12 decision variables and 7 constraints

12) what is said to exist when total demand equals total supply in a transportation problem = a
balanced problem

13) the minimal-spanning technique would be best used = to determine powerline
communication network wiring within a building.

14) the shortest-route technique would be best used to = determine the path for a truck going
from origin to destination

16) the critical path of a network is the = Longest time path through the network.

17) in a PERT network, the earliest (activity) start time is the =
The earliest time that an activity can start without violation or precedence requirement .

18) the expected time in PERT =The weighted average of the most optimistic time, most
pessimistic time and four times the most likely time.

19) The critical path of a network is the = Path with zero slack or Longest time path through
the network.
(This was on that post by Tommy yesterday. And it is on there twice with different answers.)

20) In a pert network, the latest (activity) start time is the= latest time that an activity can
be started without delaying the entire project.

22) CPM stands for = critical path method

, Bus 190 Exam Study

23) random variable is a variable with values that are = based on probability distribution

24) when a project management network has multiple critical paths, reducing project completion
time by 1 unit = all critical paths

25) The best period of time to crash a project is when the benefit = Exceeds the cost the most

27) in project crashing, the following may happen = a non-critical activity becomes critical

28) value of the dual variable associated w/ constraint in LP solution is the change in = the
objective function from a unit increase in the limit of the constraint

29) the reason that the normal distribution is so prevalent is due to = the Central Limit
Theorem

30) when many independent probability distributions are summed together, which of following
statement is incorrect = The standard deviation of the sum equals to the sum of the
standard deviations.

31) When multiple activities go into finish, the latest finishing time for all activities = largest of
earliest finishing times

32) for the set of 10 normalized weights, which of the following is incorrect = the sum of the
weights equals 10.

*I see another question number 31. SO i put it below here
31) An investor wants to invest up to $100,000 as follows:
X amount into a Certificate of Deposit (CD) that yields an expected annual return of 1% with a
risk index of 2,
Y amount into a Bond with an expected annual return of 3% and a risk index of 4,
Z amounts into a Stock with an expected annual return of 5% and a risk index of 8.
The investors objective is to maximize the total expected annual return of the investment.
However, to be prudent, the investor requires that:
The fraction of the total investment in X must be at least 30%.
The fraction of the total investment in Y must be at least 40% but not exceed 60%.
The fraction of the total investment in Z must not exceed 70%.
The combined portfolio risk index must not exceed 5.

31a) Formulate this investment problem as a linear program by using decimal point numbers for
percentages of return & dollars for the investment amount.
€14,34
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
scaveromulo1

Maak kennis met de verkoper

Seller avatar
scaveromulo1 Yale University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
2 jaar
Aantal volgers
1
Documenten
242
Laatst verkocht
1 jaar geleden

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen