100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Presentatie

Engineering Graphics and Design (EGD) - Practical Assessment Task (PAT) Grade 12 IEB

Beoordeling
-
Verkocht
1
Pagina's
37
Geüpload op
15-11-2023
Geschreven in
2023/2024

This document encompasses the comprehensive Engineering Graphics and Design (EGD) practical assessment task (PAT) for 2023, focusing on the design and creation of science classrooms. Scoring a high 98%, this task contributes to 25% of the final Grade 12 EGD mark. It outlines the complete project, starting from its initial design brief, specifications, and constraints. The report delves into various elements critical to the project, including septic tanks, grey water systems, energy-saving fixtures, solar water geysers, and features to support the differently-abled. Additionally, it provides detailed insights into classroom interiors, like worktop surfaces, flooring, window frames, and additional fixtures. The latter sections of the document present evaluations, floor plans, elevations, potential improvements, and a personal introspection. The document concludes with a bibliography, ensuring all sources of information are appropriately acknowledged.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

EGD PAT 2023
EGD PAT 2023

,Declaration of Authenticity

,Theo Apteker


Table of Contents
2023 Assessment Sheet .........................................................................................................................................................................................................
Declaration of Authenticity ...................................................................................................................................................................................................
Design Brief ..........................................................................................................................................................................................................................
Specifications........................................................................................................................................................................................................................................
Constraints ...........................................................................................................................................................................................................................................
Septic tanks and Grey Water Systems ...................................................................................................................................................................................
Energy Saving Fixtures and/or FeaturesSeptic tanks and Grey Water Systems .......................................................................................................................
Energy Saving Fixtures and/or Features ................................................................................................................................................................................
Solar Water GeysersEnergy Saving Fixtures and/or Features .................................................................................................................................................
Solar Water Geysers .............................................................................................................................................................................................................
Handicap Friendly Bathroom Fixtures And/or FeaturesSolar Water Geysers ...........................................................................................................................
Handicap Friendly Bathroom Fixtures And/or Features ..........................................................................................................................................................
Types of Worktop SurfacesHandicap Friendly Bathroom Fixtures And/or Features .................................................................................................................
Types of Flooring ..................................................................................................................................................................................................................
Classroom Fixtures And/Or FeaturesTypes of Flooring ...........................................................................................................................................................
Types of Window Frames ......................................................................................................................................................................................................
Types of FlooringTypes of Window Frames ............................................................................................................................................................................
Types of Worktop Surfaces....................................................................................................................................................................................................
Types of Window FramesTypes of Worktop Surfaces .............................................................................................................................................................
Classroom Fixtures and/or Features ......................................................................................................................................................................................
EVALUATION OF CHOSEN SOLUTION .....................................................................................................................................................................................
Floorplan ..............................................................................................................................................................................................................................................
Positives ............................................................................................................................................................................................................................................................................................
Negatives ..........................................................................................................................................................................................................................................................................................
Potential improvements ...................................................................................................................................................................................................................................................................

,Design Brief
Michaelhouse, a high school, has partnered with a primary school in the Balgowan area, which hosts leadership
fundraising campaign to help the primary school construct new classrooms and toilet facilities. The fundraising
construct a Classroom Block comprising two Science classrooms and handicap-friendly boys' and girls' toilet/b
headmaster has tasked the Engineering Graphics and Design students with creating designs for the new block.
to the school's architects for approval, and the winner will work with the architects to oversee the construction
waterborne sewage, a new septic tank or greywater system will need to be installed. The newly built classroom
support and encourage a robust learning environment, and the new classrooms must be practical in application
the installation of rainwater capture tanks and stand as an environment for inclusivity to thrive, as the bathroo
friendly features.

Specifications
The building design needs to include two science classrooms. The maximum size of each classroom can be 85 m
facilities must incorporate fixtures and features that cater to students with physical disabilities. These may incl
other accessibility provisions ensuring all students access. Rainwater capture tanks should be integrated into th
rainwater for flushing toilets and irrigation purposes. This will not only help reduce potable water usage but als
consumption. Given the absence of a waterborne sewage system, the new block will require either a septic tan
wastewater. This system should be both environmentally sustainable and cost-effective while ensuring the saf
of wastewater.

Constraints
The design must fit within the school's budget and should be aligned with the goal to maximise the student's le
lab. The timeline established by the school must be considered to ensure the building is completed within that

,Theo Apteker


2023 Assessment Sheet

,Theo Apteker

,Theo Apteker

,Theo Apteker

, Theo Apteker
Septic tanks and Grey Water Systems

Name Conventional Septic Tank Energy Saving FixturesAerobic
and/or Septic tank

FeaturesSeptic tanks and Grey Water
Systems


Image




A septic tank is a critical component of a wastewater treatment system for buildings not connected to a public sewer system. It works by
Abstract
soil, which is further treated and filtered by natural processes.
When choosing a septic tank, several factors need to be considered, including soil type and drainage capacity, the tank size required,
Consideration requirements, cost, and environmental impact. These factors will help determine the most appropriate and cost-effective system for the
local regulations and standards.
- More efficient treatment of wastewater, producing cleaner
Advantages - Cost-Effective
effluent

- Simple installation and maintenance - Requires less space than conventional septic tanks

- Minimal mechanical components, therefore reducing
- Can handle higher volumes of wastewater
risk of malfunctions

- Requires regular pumping to remove sludge and
Disadvantages - Requires electricity to operate the blower
scum

- Not suitable for high soil-water tables or poor - May require regular maintenance to proper oxygen levels and
drainage areas bacteria growth

Geschreven voor

Instelling
Vak
Schooljaar
200

Documentinformatie

Geüpload op
15 november 2023
Aantal pagina's
37
Geschreven in
2023/2024
Type
Presentatie
Persoon
Onbekend

Onderwerpen

€27,35
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
theoapteker
2,0
(1)

Maak kennis met de verkoper

Seller avatar
theoapteker
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
9
Lid sinds
3 jaar
Aantal volgers
6
Documenten
21
Laatst verkocht
1 maand geleden

2,0

1 beoordelingen

5
0
4
0
3
0
2
1
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen