100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

Wastewater Treatment Class B Test Questions and Answers 100% Correct

Beoordeling
-
Verkocht
5
Pagina's
5
Cijfer
A+
Geüpload op
14-08-2023
Geschreven in
2024/2025

Wastewater Treatment Class B Test Questions and Answers 100% Correct

Instelling
Wastewater Treatment Class B
Vak
Wastewater Treatment Class B









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Wastewater Treatment Class B
Vak
Wastewater Treatment Class B

Documentinformatie

Geüpload op
14 augustus 2023
Aantal pagina's
5
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Wastewater Treatment Class B Test Questions
and Answers 100% Correct
Lift stations at a treatment plant or those which discharge directly to a treatment
plant with an average flow greater than 0.1 MGD shall have three or more pumps or
have automatically controlled variable capacity pumps, these pumps should be
adjusted to actual flow conditions and controlled to operate so as to: - Minimize
surges in the treatment in the treatment units.

In the contact stabilization system of activated sludge treatment, the detention time
in the contact zone is designed be _______ other types of activated sludge treatment. -
shorter than

According to current TCEQ wastewater operator certification rules, an operator can
renew a Class D Wastewater Treatment Plant Operator if he or she:
A) Works only in a collection system
B) Is an operator at an activated sludge plant
C) Is an operator at a trickling filter treatment facility with a permitted daily average
flow of 0.15 MGD.
D) Both A and C.
E) None of the Above - None of the Above

If a Leak is suspected in an off-line, back-up, one-ton chlorine cylinder, after putting
on proper safety equipment, the operator should first: - Call appropriate emergency
response personnel.

The definition of an oxygen-deficient atmosphere is one that contains less than
________ percent oxygen. - 19.5

A combustible atmosphere: - contains oxygen and flammable gas, vapor, or dust

All of the following EXCEPT ________ are damaging or irritating to the mucus
membranes or lungs if inhaled:
A) Ozone
B) Lime Dust
C) Chlorine Gas
D) Carbon Dioxide
E) Ferric Chloride Dust - Ozone

The Sludge Volume Index (SVI) is: - the volume of settled sludge (30-minutes) in
ml/L times 1000, divided by the concentration in mg/L of MLSS.

Biomonitoring - Involves the use of aquatic life to test the toxicity of a wastewater
treatment plant effluent.

, A 24-Hour composite sample was tested for chlorine residual and found to contain
none. These results indicate that: - Residual chlorine was NOT present during the 24-
hour period.

In an activated sludge treatment plant, the 30 minute settleability test indicates:
A) The clarity of the effluent
B) The influence of surface tension settling
C) The current settling capabilities in the clarifier
D) The ability of the organisms to flocculate and settle.
E) All of the above - E) All of the above

Setting work goals for an individual works best - Accompanied by an action plan

One element of being an effective communicator is to: - be a good listener

An efficient primary clarifier is expected to remove _______ of the influent, settable
solids. - 90 percent or better

Primary wastewater treatment facilities make use of - the force of gravity and
density differences between the water and the solids.

If the inside diameter of the lift station wet well is 8 feet, and the vertical separation
between "lead pump on" and "all pumps off" (low water line) is 4 feet 9 inches, the
approximate storage in the wet well during a normal pump cycle is: - 1,785 gallons

Assume that both pumps shown in the exhibit are working. The function of float
switch B is to turn : - The lead pump on

The extent of treatment necessary at a particular wastewater treatment plant
depends upon:
A) The treatment plant location
B) Water quality standards set for the receiving stream
C) Amount and final use of the treatment plant effluent
D) the type and concentration of wastes received at the plant for treatment .
E) All of the above - All of the above

In most pressure sewer systems, the plumbing units or grinder pumps at each
residence are considered to be - the integral part of the wastewater collection
system

Assume that a pumping unit with a 14 3/4 inch impeller has characteristics as
described by the pump curve shown in the exhibit. If the pumping unit is working
against a static head of 47 feet, and the force main on the discharge side has a total
friction loss of 4 feet, the approximate pump discharge should be - 1550 gallons per
minute
€11,83
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Boffin Harvard University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1763
Lid sinds
4 jaar
Aantal volgers
1469
Documenten
7146
Laatst verkocht
11 uur geleden
Pilot Study

Prevent resits and get higher grades.

3,8

433 beoordelingen

5
209
4
74
3
70
2
16
1
64

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen