100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

[Solution Available] FIN 301 Penn State World Campus Final Excel project

Beoordeling
-
Verkocht
-
Pagina's
14
Cijfer
A+
Geüpload op
12-08-2023
Geschreven in
2023/2024

FIN 301 Penn State World Campus Final Excel project Scenario: Tom Jones, the CFO for the firm PSUWC Energy, LLC, woke up with a start at 4:00 am on July 2, 2012, due to his phone ringing. It was his senior financial analyst, vacationing in Europe, calling with bad news. Tom was supposed to present his project evaluation, at the end of the week, for the Board's proposal that they invest in new equipment that generates electricity, using a new nuclear technology. His staff of financial analysts had been working hard over the last few weeks collecting data and had prepared a model creating a financial forecast about the proposed project's viability. Disaster had struck on the night of July 1'st wherein malware all but wiped out the work of the analysts. Tom needed to prepare a financial analysis of the project to present the Board with his recommendations. All the staff had already left for the July 4th vacation and Tom was on his own. Tom quickly reached his office and managed to salvage what was left of the excel spreadsheet prepared for the presentation. The excel file is attached to this document. What follows is some basic information that Tom knew and was able to retrieve about the project. PSUWC's existing plant has excess capacity, in a fully depreciated building, to install and run the new equipment. Due to relatively rapid advances in the technology, the project was expected to be discontinued in six years. The proposed project was capable of providing 35,000 kW1 per hour power. Typically, PSUWC ran its plants 24 hours a day, 7 days a week at an average of 58% Capacity factor2, which is what the project would start with. However, his engineers had assured him that the implementation of the new technology would enable them to increase their capacity factor by 15% a year till they reached a 100% capacity factor. A total investment of $34 Million USD for new equipment was required. The equipment had fixed maintenance contracts of $4,000,000 per year with a salvage value of $7,000,000 and variable costs were 50% of revenues. The new equipment would be depreciated to zero using straight line depreciation. The new project required an increase in working capital of $6,000,000 and $1,000,000 of this increase would be offset with accounts payable. PSUWC would be able to sell all the electricity it generated at the rate of $0.15 per kilo-watt hour in the market they served. 1 kW stands for kilo-watt or 1000 watts. A watt is a measure of power. Electricity is priced in kWh (kilo-watt hours). 1 kilo-watt hour represents 1000 Watts of power expended for one hour (1 h) of time. The average price people in the U.S. pay for electricity is about 12 cents per kilowatt-hour. (Context: A typical U.S. household uses about 908 kWh a month of electricity.) 2 The net capacity factor of a power plant is the ratio of its actual output over a period of time, to its potential output if it were possible for it to operate at full nameplate capacity continuously over the same period of time. To calculate the capacity factor, take the total amount of energy the plant produced during a period of time and divide by the amount of energy the plant would have produced at full capacity. Capacity factors vary greatly depending on the type of fuel that is used and the design of the plant. The corporate tax rate was 35 percent and PSUWC currently has 1,000,000 shares of stock outstanding at a current price of $16. The company also has 30,000 bonds outstanding, with a current price of $960. The bonds pay interest semi-annually at the coupon rate is 5.6%. The bonds have a par value of $1,000 and will mature in twenty years. Even though the company has stock outstanding it is not publicly traded. Therefore, there is no publicly available financial information. However, management believes that given the industry they are in the most reasonable comparable publicly traded company is Companhia Paranaense de Energia - COPEL (NYSE Ticker Symbol ELP)3. In addition, management believes the S&P 500 is a reasonable proxy for the market portfolio. Therefore, the cost of equity is calculated using the beta from ELP and the market risk premium based on the S&P 500 annual expected rate of return4. Tom knew that because of the size of the proposed project, he had to take into account the change in capital structure the new project would cause his firm. To this end, he had a choice between raising the new capital needed either using 75/25% split between issuing bonds/equity or a 25/75% split between issuing bonds/equity5. The bonds would have to be retired at the end of the project's life6. Tom knew that the cost of debt would depend on the new D/E ratio that the firm would have based on his decision to raise capital. Tom looked at the worksheet titled

Meer zien Lees minder
Instelling
FIN 301 Penn
Vak
FIN 301 Penn









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
FIN 301 Penn
Vak
FIN 301 Penn

Documentinformatie

Geüpload op
12 augustus 2023
Aantal pagina's
14
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Andymoh Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
3223
Lid sinds
4 jaar
Aantal volgers
2383
Documenten
4508
Laatst verkocht
4 uur geleden
QUALITY DOCUMENTS FOR BEST RESULTS.

In my page you will find latest Exams, Test Banks,Solutions Manual, Exam Elaboration, Discussions, Case Studies,Essays etc. I upload quality and verified documents at an affordable price. Also check out the package deal and be guaranteed to pass. Help others to benefit from this study materials by leaving a review, SUCCESS.

4,1

655 beoordelingen

5
392
4
111
3
63
2
23
1
66

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen