100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Essay

Unit 9 IT Project Management Assignment 1 (Learning Aim A) Distinction

Beoordeling
-
Verkocht
1
Pagina's
14
Cijfer
A+
Geüpload op
28-06-2023
Geschreven in
2022/2023

UNIT 9 IT PROJECT MANAGEMENT, COVERS ALL CRITERIA DISTINCTION LEVEL ASSIGNMENT Learning aim A: Investigate the principles and methodologies of IT project management as used in industry A.P1 Explain, using appropriate definitions, the characteristics of different methodologies applied in IT projects. A.P2 Explain the project management structures applied in different IT projects. A.M1 Compare, using appropriate definitions, the characteristics of different methodologies and structures applied in IT projects. A.D1 Evaluate, using appropriate definitions, the characteristics of different methodologies and structures applied in IT projects. If you have any queries, feel free to message me

Meer zien Lees minder
Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Study Level
Publisher
Subject
Course

Documentinformatie

Geüpload op
28 juni 2023
Aantal pagina's
14
Geschreven in
2022/2023
Type
Essay
Docent(en)
Onbekend
Cijfer
A+

Onderwerpen

Voorbeeld van de inhoud

Victor Anosike
Unit 9 – IT Projects Management
Assignment 1

Unit 9: Assignment 1 – Investigate the Principles
and Methodologies of IT Project Management as
used in Industry
In this assignment, I will be investigating the different project management
methodologies used in industries, evaluating them, and explaining the structures
used in the delivery of each project.

The Project Management Structures Applied in
Different IT Projects
A project is a collection of tasks that must be completed to achieve a specific
goal. IT Project Management is the process of achieving project goals in a
workforce within the constraints that have been set. At the start of the
development process, information about the project is provided and created. The
primary scope constraints are the goal, time, and budget. The scope is the
expectation of what the project should accomplish, the time is when the project
should begin and end, and the budget is the cost of the resources specifically
dedicated to achieving the goal. Typical IT projects involve software application
development, IT system and network installation, and data collection and
analysis.
Project life cycle
The project life cycle is a set of stages that a project goes through. This includes
five stages, which are showcased below:
 Initiating: This stage of the project life cycle consists of two separate
processes: the project charter, which is establishing the vision for your
project through the use of documents that you hope to accomplish
through the business, and the stakeholder register, which is simply
including and engaging the stakeholders in the project to secure their
approval.
 Planning: During this stage, it is critical to grasp the project's goal as well
as to establish how the project will be carried out. The following questions
should be answered to provide you with a clear picture of what the project
needs to accomplish. What exactly are we going to do? How are we going
to go about it? When are we going to get started? How will we know when
we're done? All of this is normally done in a team, which demands all
members work together to set up the entire infrastructure and assign
certain duties.
 Executing: This stage is where both the human and machine resources
are necessary to complete the task within the budgeting constraint
through distributing cost expense for resources. This includes project team
development, stakeholder engagement, and involvement from the project
team, project managers, executives, project sponsors, customers, and
users. Quality assurance entails inspecting the execution thoroughly to
ensure that the outcome meets the quality standard. Communication is an
important part of the executing phase because both the client and
stakeholders need to be kept up to date on the project's progress. Client

, Victor Anosike
Unit 9 – IT Projects Management
Assignment 1

management - this reduces stress and makes completing tasks and
meeting deadlines much easier, as well as giving the project team insight
into what needs to be done.
 Monitoring and Controlling: This stage would involve keeping an eye
on the general progress of the project. Staying alert and up to date with
tracking and reporting with the team makes everyone more aware of
possible problems before they become unmanageable. Constraints like
time would be an issue to primarily focus on to ensure that the project is
not running behind schedule - a technique that can be taken to prevent
this, for example, is making weekly checks on where individuals are on top
of their duties.
 Closing: This is the final stage of the project life cycle which needs more
than merely reporting the project as finished. Formally concluding the
project requires consent from the customer, stakeholders, and project
sponsor (if there was one). Other activities involved in this stage to ensure
proper closing include confirming that the project was delivered on time,
conducting a review meeting to acknowledge the project's triumphs and
faults to learn from, archiving project records, and officially relieving the
project team of their duties.

The Characteristics of Different Methodologies
Applied in IT Projects
Project IN Controlled Environments (PRINCE2)




This is an approach that focuses on managing resources and decreasing risks by
dividing the project into smaller stages and establishing clear roles and tasks in
hopes to boost the project's progression. Starting up a project means
assembling a project team and appointing a project board, then preparing the
brief, understanding how to approach the project, and articulating the business
case. Initiating a project requires project control, including initial planning and
risk management, creating project files and project initiation documentation, and
refining business cases. Overall, Directing a project is just granting permission
for the project to be launched, the stages completed, and the project to be
closed. In essence, Controlling a stage involves monitoring the workforce,
measuring progress, investigating or escalating issues, managing risk, and
reviewing the stages. Accepting, executing, and delivering work packages is part
of Managing Product Delivery. Managing a Stage Boundary, which
includes planning and updating a stage and the project board, in addition to
updating the business case, registers, and exceptions plans. Finally Closing a
project that includes decommissioning a project and analysing the project's
accomplishments and failures at the end.
€18,80
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Draymon Barnet and Southgate College (London)
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
112
Lid sinds
2 jaar
Aantal volgers
63
Documenten
22
Laatst verkocht
5 maanden geleden

4,2

15 beoordelingen

5
9
4
2
3
3
2
0
1
1

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen