ACQ 202 Exam Questions Review. 2022. Graded A+
ACQ 202 Exam Questions Review. 2022. Graded A+ Document Content and Description Below ACQ 202 Exam Questions Review. 2022. Graded A+ There are four basic techniques used by the DoD for creating cost estimates: Analogy, Parametric, and Actual Costs are three techniques. - Eng ineering Which appropriation category would fund the design of new equipment, material, or software? - Research, Development, Test and Evaluation What's the primary purpose of an Analysis of Alternatives (AoA)? - Provide decision-making aid in selecting a cost-effective material alternative When comparing alternative concepts to provide needed warfighting capabilities, which of the following must be met? - Thresholds Estimating potential demand for a capability and developing a rough order of magnitude (ROM) estimate of future sales are characteristics of which International Acquisition & Exportability (IA&E) Assessment area? - International Markets Both the Army and Marine Corps have a capability need to procure additional helicopters beyond the number specified in the current contract; the helicopter program is currently in production. What cost estimating technique would the services most likely use as a basis requesting the funding to pay for the additional aircraft? - Actual Cost The largest amount of software life cycle cost comes during the design development - False An AOA is a study of the _________ - Potential Acquisition Strategies for the alternatives WRONG Which of the following guidance documents requires DoD Components to incorporate interoperability and defense exportability aspects into Joint Capabilities Integration and Development System requirements documents to ensure they are addressed in initial planning and design? - DFARS Which of the following are characteristics of ICPs - Shared cost, Shared risks and benefits, and Government-to-Government To obtain guidance and (if required) approvals on the level and type of protection required, the DoD Component International Program Organization and Program Management Offices (PMOs) must engage: - TSFD technology area ("pipe") owners/authorities In certain situations, there may be a U.S. Government requirements to restrict specific portions of a weapon system sale to FMS only while permitting other portions to be acquired DCS - True As a general rule of thumb _______ of the total ownership costs of a system occur late in the life cycle, due to costs associated with operations and support. - 70-80% What element of IA&E assess the risks of transferring controlled technology and information that provide U.S. warfighters a combat advantage as well as the benefits of international participation? - Sales and Transfers WRONG For FMS non-program of record acquisition programs, the FMS customer nation is responsible for developing, awarding, and executing the contract in accordance with their own contracting policies and procedures. - False ___
Geschreven voor
- Instelling
- ACQ 202
- Vak
- ACQ 202
Documentinformatie
- Geüpload op
- 30 april 2023
- Aantal pagina's
- 4
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
acq 202 exam questions review 2022 graded a document content and description below acq 202 exam questions review 2022 graded a there are four basic techniques used by the dod for creating cost e
Ook beschikbaar in voordeelbundel