CWEA E/I 2 Study Guide Questions and Answers 2023 with complete solution
CWEA E/I 2 Study Guide Questions and Answers 2023 with complete solution 1. Receiving job instruction and planning equipment use are part of: a. craft data. b. job preparation. c. work factors. d. leveled time.: b. job preparation 2. Anticipating other tasks or problems: a. usually creates additional problems. b. wastes time. c. sharply reduces the number of emergencies. d. often is not worth the effort.: c sharply reduces the number of emergencies 3. Making job planning a group effort: a. wastes time. b. improves productivity. c. causes confusion. d. All the above: b improves productivity 4. Rubber safety gloves should be tested how often? a Every 12 months b. Every 9 months c. Every 6 months d. Every 4 months: a Every 12 months 5. Rubber safety blankets should be tested how often? a. Every 6 months b. Every 9 months c. Every 12 months d. Every 18 months: b Every 9 months 6. What is the interrupting current of a GFIC receptacle? a. 20 VAL b. 5 MA c. 10 UDL d. 20 MA: b 5 MA 7. What type of stepladder is forbidden while working on electrical equip- ment? a. Wood b. Fiberglass
Geschreven voor
- Instelling
- Cwea
- Vak
- Cwea
Documentinformatie
- Geüpload op
- 18 januari 2023
- Aantal pagina's
- 36
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
cwea ei 2 study guide questions and answers 2023 with complete solution
Ook beschikbaar in voordeelbundel