Project Management 2nd Edition by Pinto chapter 07 Test bank

Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
27 oktober 2015
Aantal pagina's
32
Geschreven in
2014/2015
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Voorbeeld van de inhoud

Project Management, 2e (Pinto)
Chapter 7 Risk Management

7.1 True/False

1) The risk is highest in the earliest phase of the project life cycle.
Answer: TRUE
Diff: 1
Section: 7.0 Introduction
Skill: Factual
AACSB Tag: Reflective

2) As risk decreases in the project life cycle, opportunity increases.
Answer: FALSE
Diff: 1
Section: 7.0 Introduction
Skill: Factual
AACSB Tag: Reflective

3) Risks can be quantified by multiplying the likelihood a failure will occur by the severity of the
failure.
Answer: TRUE
Diff: 2
Section: 7.0 Introduction
Skill: Analytical
AACSB Tag: Analytic Skills

4) Technical risk is the probability that the project will not perform to the required standards or
produce substandard products or have excessive operating cost consumption.
Answer: TRUE
Diff: 2
Section: 7.1 Risk Management: A Four-Stage Process
Skill: Factual
AACSB Tag: Reflective

5) The probability that the investments made to fund the front-end activities will be lost due to
project abandonment is financing risk.
Answer: FALSE
Diff: 2
Section: 7.1 Risk Management: A Four-Stage Process
Skill: Definition
AACSB Tag: Reflective




1
Copyright © 2010 Pearson Education, Inc.

, 6) One approach to risk mitigation is simply to accept it.
Answer: TRUE
Diff: 2
Section: 7.1 Risk Management: A Four-Stage Process
Skill: Factual
AACSB Tag: Reflective

7) Risk cannot be transferred because ultimately your own project will suffer the consequences if
the event occurs.
Answer: FALSE
Diff: 2
Section: 7.1 Risk Management: A Four-Stage Process
Skill: Factual
AACSB Tag: Reflective

8) Contingency reserves require a construction company to hold back some funds in an account
just in case something happens that increases the overall project cost.
Answer: TRUE
Diff: 2
Section: 7.1 Risk Management: A Four-Stage Process
Skill: Factual
AACSB Tag: Reflective

9) The highest dollar value of reserves is typically task contingency.
Answer: FALSE
Diff: 2
Section: 7.1 Risk Management: A Four-Stage Process
Skill: Factual
AACSB Tag: Reflective

10) The PRAM model for risk management proposes that risk management follow a life cycle
much as projects follow a life cycle.
Answer: FALSE
Diff: 2
Section: 7.2 Project Risk Management: An Integrated Approach
Skill: Factual
AACSB Tag: Reflective

7.2 Fill in the Blank

1) __________ is defined as the art and science of identifying, analyzing, and responding to risk
factors throughout the life of a project and in the best interests of its objectives.
Answer: Risk management
Diff: 1
Section: 7.0 Introduction
Skill: Factual
AACSB Tag: Reflective

2
Copyright © 2010 Pearson Education, Inc.
€3,49
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
smith2324 European Business School, London
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
94
Lid sinds
10 jaar
Aantal volgers
39
Documenten
196
Laatst verkocht
1 jaar geleden

4,5

24 beoordelingen

5
13
4
9
3
2
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen