ANSWERS SURE A+
✔✔· What is the smallest length of structure that NIOSH 7402 method can count? -
✔✔0.5 microns
✔✔· What are the 4 classes of abatement? - ✔✔Removal of friable ACM
Removal of non-friable ACM
Repairs and operations
Maintenance
✔✔· What are 7 NESHAP Class I materials? - ✔✔Cement
Transite
Mastic
Roof felt
Roof tiles
Water pipes
Resilient flooring
✔✔· What are the 4 recognized testing programs? - ✔✔NVLAP
NIST
Round Robin
AIHA
✔✔· What is claims made insurance? - ✔✔Only protects if the insurance is in place
when the claim is made (injury or effect is observed)
✔✔· What is bonding? - ✔✔Protects owners against financial default
✔✔· What are performance bonds? - ✔✔Agrees to complete the project if the contractor
can't.do so
Pay for labor and materials if contactor fails to do so
, ✔✔· What are bid bonds? - ✔✔Ensures that the building owner will be able to award the
job for the lowest bid within 5-10%
✔✔· What are examples of contractual liability? - ✔✔Liable for breach of contract
Ex: timeframe, sampling specs, laboratory use
✔✔· What are examples of tort? - ✔✔Inability to inspect in accordance with skills
required
Improperly taking samples
Failing to notify occupants
✔✔· What are examples of criminal liability? - ✔✔Inspector must know their actions are
wrong
The inspector must perform a guilty act
✔✔· What are Errors & Omissions? - ✔✔Protects architects, engineers and project
designers against misjudgment
✔✔What does AHERA cover? - ✔✔All public and private non-profit primary and
secondary schools
✔✔· Date of AHERA? - ✔✔December 14, 1987
✔✔· What date must the LEA inspect school buildings by? - ✔✔October 12, 1988
✔✔· What date must the LEA have the management plan by? - ✔✔July 9, 1989
✔✔· When do you have to be AHERA certified? - ✔✔Jobs over 100 sq. ft., DOSH
licensed
✔✔· What is the OSHA respiratory standard? - ✔✔29 CFR 1910.134
✔✔· What are the 3 NESHAP categories? - ✔✔Friable ACM
Category I non-friable
Category II non-friable
✔✔· Who do you notify before building demolition? - ✔✔EPA/APCP
✔✔· Does RACM need to be removed before abating? - ✔✔Yes, under NESHAP
✔✔· If no asbestos, who do you notify on a full demo? - ✔✔NESHAP