PJM Generator Exam Questions with 100% Correct Answers
| Verified || ACTUAL EXAM 2026 TEST!! Graded A+ |
2025|2026 EXAM UPDATE
Leave the first rating
Save
Students also studied
Flashcard sets Study guides
PJM Generation Dispatcher Exam 20... LMS Test Answers PJM Generation Cert PJM
116 terms 73 terms 271 terms 20
Joanna_UH Preview kuliklac000 Preview seanzap Preview
Terms in this set (61)
The purpose of the Deploy All Resources Action is to immediately upon receipt of dispatch instruction
instruct all generating resources to be on line and at full
output _________
A Heavy Load Voltage Schedule Warning has been Ensure all unit voltage regulators are in service
issued for the PJM RTO. Generation Operators should:
PJM can issue the Deploy All Resources Action for________ the entire RTO, specific Control Zones or a subset of a Control Zone if
transmission limitations exist
Under the National Terrorism Advisory System (NTAS) Imminent Threat Alert
there are 2 types of alerts: Elevated Threat Alert and
__________.
A Geomagnetic Disturbance Warning is issued by PJM K7
when the NOAA has issued a warning or an alert for a
potential geo-magnetic storm of severity _______ or
greater.
, The Generating Capacity reported on a Supplementary Capacity from offline Hydro and CT units that can be synchronized within 10
Status Report (SSR) includes which of the following? minutes.
(Select 2) Total Capacity from online Generation.
What is the requested response time for members to 10 Minutes
reply to a request for SSR data?
If a PJM Member has received reports of a terrorism or The PJM Shift Supervisor
sabotage threat to their facilities, they would notify
whom at PJM (in addition to NERC and the DOE) to
share this information?
What is the purpose of a capacity emergency warning? To keep Members informed of actual capacity shortages or contingencies that
(Select 2) may jeopardize reliability during real time operations. To ask Members to take
specific actions in order to provide relief to the PJM system
PJM has issued a Minimum Generation Alert. Your 25 MW
current generation output is 200 MW. The Economic
Minimum is 150 MW and Emergency Minimum is 125
MW. How much ERG should be reported for this unit?
A Manual Load Dump Warning will be issued when: Primary Reserve is less than the largest generating unit or the loss of a
transmission facility jeopardizes reliability after all possible measures have been
taken to increase reserves
Actions in a Low Voltage Alert include: (Select 2) Request a Reactive Reserve Check
Review transmission and generation outages
Which entities can cancel generator reactive capability PJM and the affected TO
tests prior to or during the testing process? (Select 2)
With whom does PJM share the results of generation The affected TO
reactive capability tests?
How does the Generation Owner/Operator inform PJM eDART
and the TO of scheduled AVR or PSS outages?
Why does PJM require an additional notification of Unit To allow PJM and TOs to make adjustments to system voltages prior to the test
testing 30 minutes prior to the GO/MOC performing
the reactive capability test?
For real-time changes in Reactive Capability, The Notify PJM and the respective TO via phone
GO/MOC should submit an updated D-curve via
eDART and ____________.
| Verified || ACTUAL EXAM 2026 TEST!! Graded A+ |
2025|2026 EXAM UPDATE
Leave the first rating
Save
Students also studied
Flashcard sets Study guides
PJM Generation Dispatcher Exam 20... LMS Test Answers PJM Generation Cert PJM
116 terms 73 terms 271 terms 20
Joanna_UH Preview kuliklac000 Preview seanzap Preview
Terms in this set (61)
The purpose of the Deploy All Resources Action is to immediately upon receipt of dispatch instruction
instruct all generating resources to be on line and at full
output _________
A Heavy Load Voltage Schedule Warning has been Ensure all unit voltage regulators are in service
issued for the PJM RTO. Generation Operators should:
PJM can issue the Deploy All Resources Action for________ the entire RTO, specific Control Zones or a subset of a Control Zone if
transmission limitations exist
Under the National Terrorism Advisory System (NTAS) Imminent Threat Alert
there are 2 types of alerts: Elevated Threat Alert and
__________.
A Geomagnetic Disturbance Warning is issued by PJM K7
when the NOAA has issued a warning or an alert for a
potential geo-magnetic storm of severity _______ or
greater.
, The Generating Capacity reported on a Supplementary Capacity from offline Hydro and CT units that can be synchronized within 10
Status Report (SSR) includes which of the following? minutes.
(Select 2) Total Capacity from online Generation.
What is the requested response time for members to 10 Minutes
reply to a request for SSR data?
If a PJM Member has received reports of a terrorism or The PJM Shift Supervisor
sabotage threat to their facilities, they would notify
whom at PJM (in addition to NERC and the DOE) to
share this information?
What is the purpose of a capacity emergency warning? To keep Members informed of actual capacity shortages or contingencies that
(Select 2) may jeopardize reliability during real time operations. To ask Members to take
specific actions in order to provide relief to the PJM system
PJM has issued a Minimum Generation Alert. Your 25 MW
current generation output is 200 MW. The Economic
Minimum is 150 MW and Emergency Minimum is 125
MW. How much ERG should be reported for this unit?
A Manual Load Dump Warning will be issued when: Primary Reserve is less than the largest generating unit or the loss of a
transmission facility jeopardizes reliability after all possible measures have been
taken to increase reserves
Actions in a Low Voltage Alert include: (Select 2) Request a Reactive Reserve Check
Review transmission and generation outages
Which entities can cancel generator reactive capability PJM and the affected TO
tests prior to or during the testing process? (Select 2)
With whom does PJM share the results of generation The affected TO
reactive capability tests?
How does the Generation Owner/Operator inform PJM eDART
and the TO of scheduled AVR or PSS outages?
Why does PJM require an additional notification of Unit To allow PJM and TOs to make adjustments to system voltages prior to the test
testing 30 minutes prior to the GO/MOC performing
the reactive capability test?
For real-time changes in Reactive Capability, The Notify PJM and the respective TO via phone
GO/MOC should submit an updated D-curve via
eDART and ____________.