Tripod Setup
Ans: Position legs evenly; use stabilizer on hard surfaces.
Level/Transit Instrument
Ans: Attach to tripod, level using 16-degree rotations.
Level Rod
Ans: Place bottom at desired elevation point.
Instrument Head Rotation
Ans: Rotate to 0°, 90°, 180°, 270°, and back.
Gun Sight
Ans: Align instrument head towards the Level Rod.
Focus Dials
All rights reserved © 2025/ 2026 |
, Page |2
Ans: Use dials to bring Level Rod into view.
Laser Instrument
Ans: Attach to tripod; activate when level.
Laser Level Receiver (LLR)
Ans: Attach to Level Rod; adjust until flat line.
Tolerance Indicator
Ans: Set desired tolerance on Laser Level Receiver.
Wall Assembly Teams
Ans: Divide into teams for wall construction tasks.
Sole Plate
Ans: Bottom horizontal member of wall framing.
Top Plate
Ans: Horizontal member at the top of wall framing.