100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

PMG Course 1,2, 3 Exam with All Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+

Beoordeling
-
Verkocht
-
Pagina's
13
Cijfer
A+
Geüpload op
18-01-2026
Geschreven in
2025/2026

PMG Course 1,2, 3 Exam with All Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+

Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
18 januari 2026
Aantal pagina's
13
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

PMG Course 1,2, 3 Exam with All Correct & 100%
Verified Answers |Actual Complete Exam |Already
Graded A+

True or False: A Project is defined as being unique and temporary, with an undefined start and finish.
a. False
b. True ✔Correct Answer-a

We discussed three types of matrix organizations, they are:
a. Light, Medium and Heavy
b. Weak, Medium Strength and Strong
c. Weak, Balanced and Strong
d. Light, Mid-strength and Strong ✔Correct Answer-c

In a projectized organization:
a. Team members are never assigned to the project full time.
b. A project manager is not assigned to the team.
c. The functional manager has all of the power.
d. The project manager acts as manager of the team. ✔Correct Answer-d

True or False: The best organization to use to run a project will always be the projectized
organization.
a. True
b. False ✔Correct Answer-b

The five project management process groups as described in the PMBOK® Guide and discussed in the
preceding lesson are:
a. Requirements, design, development, testing, implementation
b. Define, measure, analyze, improve, control
c. Kickoff, requirements, plan, schedule, control
d. Initiating, planning, executing, monitoring and controlling, closing ✔Correct Answer-d

The three components of the triple constraint are:
a. Scope, Performance, Time
b. Scope, Performance, Cost
c. Scope, Cost, Time
d. Scope, Quality, Cost ✔Correct Answer-c

You have finished planning and have begun executing the project when the client asks if you would
add some important features to the product of the project. How are the triple constraints affected?
a. Adding features will require additional cost but not time
b. Time and cost may both be affected
c. Scope and quality would be affected but not cost
d. Cost must remain constant because resources are limited ✔Correct Answer-b

The primary role of the project manager is:
a. Communication
b. Project initiation

, c. Distributing work packages
d. Measuring performance ✔Correct Answer-a

As discussed in the preceding lesson, The PMBOK® Guide knowledge areas that have processes in
the Initiating process group are:
a. Project Integration Management and Project Time Management
b. Project Integration Management and Project Scope Management
c. Project Integration Management and Project Stakeholder Management
d. Project Integration Management and Project Quality Management ✔Correct Answer-c

As discussed in the preceding lesson, The PMBOK® Guide describes 10 Project Management
Knowledge Areas. Identify 3 out of the 10:
a. Quality, Process, Scope
b. Contracts, Process, Risk
c. Cost, Integration, Process
d. Cost, Scope, Time ✔Correct Answer-d

The definition of a stakeholder includes:
a. People and organizations that are not impacted by your project.
b. Organizations impacted by your project but not people, they are all part of the impacted
organizations.
c. People who are impacted by your project, but not organizations impacted by your project.
d. The people or organizations that are positively or negatively impacted by your project. ✔Correct
Answer-d

True or False: If you are not certain who your stakeholders are, asking who will use the product or
service being created can be helpful.
a. True
b. False ✔Correct Answer-a

If a stakeholder has high interest and high power then as the project manager you:
a. Can try to move them to be low interest and low power so that they do not take up too much of
your time.
b. Can ignore them, they are as you need them to be.
c. Can try to move them to be high interest and low power so they do not get in your way.
d. Focus your time and attention on them, they are very impactful to your project and you want to
keep them engaged and positive. ✔Correct Answer-d

You just came from a meeting with one of your project stakeholders, he knew about your project and
was not against it, but did not seem to be particularly interested in it either. How would you classify
him?
a. Neutral
b. Resistant
c. Unaware
d. Supportive ✔Correct Answer-a

True or False: The Project Sponsor is responsible for stakeholder expectations management.
a. True
b. False ✔Correct Answer-b

Who is the stakeholder that will ultimately use the product or service you are creating?

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Stuvia2026 Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
13
Lid sinds
8 maanden
Aantal volgers
0
Documenten
4018
Laatst verkocht
1 week geleden
"Your trusted Hub for Academic Excellence"

Stuvia 2024 is your trusted destination for top-tier study materials, including high-quality exams, assignments, and verified answer keys. Our content is crafted for excellence thorough, up-to-date, and tailored to help students succeed in their academic journey. Whether you're preparing for a final exam or need support with coursework, every document in our store is designed to provide clarity, accuracy, and confidence. At Stuvia 2024, academic success starts with the right resources.

Lees meer Lees minder
3,0

1 beoordelingen

5
0
4
0
3
1
2
0
1
0

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen