POWER ENGINEERING PART A 1 EXAM QUESTIONS AND ANSWERS 2026

Beoordeling
-
Verkocht
-
Pagina's
18
Cijfer
A+
Geüpload op
14-01-2026
Geschreven in
2025/2026

Which of the following is not a definition of a power plant? a) Any one or more boilers in which steam or other vapour is generated at more than 103 kPa (15 psi). b) Any one or more boilers containing liquid and having a working pressure exceeding 1100 kPa (160 psi). c) Any one or more boilers containing liquid and having a working temperature exceeding 121 degrees Celsius (250 degrees Fahrenheit). d) Any one or more boilers in which steam or other vapour is generated at less than 57 kPa (8 psi). e) Any engine run from one or more boilers containing liquid and having a working pressure exceeding 1100 kPa (160 psi - ANSWERSd) Early government involvement in certification of power engineers became more important for the following reasons except: a) efficiency b) labour mobility c) safety d) pollution e) technological advancements - ANSWERSd) Which of the following is not characteristic of increased automation in power plants? a) computerised control stations b) increased mechanisation c) manual flame checking d) continuous monitoring of processes e) continuous monitoring of costs - ANSWERSc "Power plant" means

Meer zien Lees minder
Instelling
Power Engineering
Vak
Power Engineering










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Power Engineering
Vak
Power Engineering

Documentinformatie

Geüpload op
14 januari 2026
Aantal pagina's
18
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

POWER ENGINEERING PART A 1
EXAM QUESTIONS AND ANSWERS
2026
Which of the following is not a definition of a power plant?

a) Any one or more boilers in which steam or other vapour is
generated at more than 103 kPa (15 psi).
b) Any one or more boilers containing liquid and having a
working pressure exceeding 1100 kPa (160 psi).
c) Any one or more boilers containing liquid and having a
working temperature exceeding 121 degrees Celsius (250
degrees Fahrenheit).
d) Any one or more boilers in which steam or other vapour
is generated at less than 57 kPa (8 psi).
e) Any engine run from one or more boilers containing liquid
and having a working pressure exceeding 1100 kPa (160 psi - ANSWERSd)

Early government involvement in certification of power
engineers became more important for the following reasons
except:

a) efficiency
b) labour mobility
c) safety
d) pollution
e) technological advancements - ANSWERSd)

Which of the following is not characteristic of increased
automation in power plants?

a) computerised control stations
b) increased mechanisation
c) manual flame checking
d) continuous monitoring of processes
e) continuous monitoring of costs - ANSWERSc

"Power plant" means

a) any one or more boilers in which steam or other vapour is
generated at more than 103 kPa (15 psi).
b) any one or more boilers in which steam or other liquid is

, generated at more than 103 kPa (15 psi).
c) any one or more boilers containing liquid and having a
working pressure exceeding 1,200 kPa (160 psi), and a
temperature exceeding 121 degrees C (250 degrees F).
d) any one or more boilers containing liquid and having a
working pressure exceeding 1,200 kPa (160 psi), and a
temperature not exceeding 121 degrees C (250 degreesF - ANSWERSa

Power engineers are

a) safety code officers in a power plant automatically.
b) qualified to perform any welding jobs in a power plant.
c) skilled workers who operate and maintain the equipment
in a power plant.
d) qualified to perform any electrical jobs in a power
plant.
e) qualified to make design changes in a power plant. - ANSWERSc

In the early days, owners of power plants hired __________
workers, who started out doing manual labour and through
acquired experience they were promoted to jobs with gradually
increasing levels of skill.

a) qualified
b) highly educated
c) trained
d) unskilled
e) college trained - ANSWERSd

In order to produce greater efficiency, higher boiler
pressures were used and this led to __________ due to
employing of unqualified operators in a power plant.

a) economic gains
b) serious accidents
c) higher efficiency
d) safer working conditions
e) less labour disputes - ANSWERSb

Which of the following is not a common work schedule for
power engineers?

a) Year round employment
b) Seasonal lay-offs
c) Eight hour days
d) Twelve hour days

, e) Rotating day and night shifts - ANSWERSb

When oil mixes with water in the boiler the resultant effect
is:

a) serious foaming
b) accumulation of very hard scale resulting in tube burnout
c) accumulation of soot
d) decrease in water level
e) shifting and loosening of baffles - ANSWERSa

The holder of a Certificate of Competency, the
classification of which authorizes him or her to act as a
engineer, may sketch, construct, install, operate, repair,
and give advice on all things pertaining to any __________ in
which that person is employed.

a) welding shop
b) automotive shop
c) power plant
d) fish plant
e) hydro plant - ANSWERSc

Power engineers can usually expect to work

a) straight 8 hour day shifts.
b) straight 12 hour day shifts.
c) straight 8 hour night shifts.
d) straight 12 hour night shifts.
e) rotating shifts. - ANSWERSe

In a power plant, the power engineer may function as a
supervisor who directs others in the __________ operation on
a shift.

a) simple and economical
b) welding and electrical
c) administrative and cooperative
d) production and receiving
e) safe and efficient - ANSWERSe

Committees which establish standards are composed primarily
of which of the following elements?

a) only experts from the industry and government
b) one government appointed standards board
€17,30
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
papersmaster01 Howard Community College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
283
Lid sinds
2 jaar
Aantal volgers
106
Documenten
14143
Laatst verkocht
4 dagen geleden
PAPERSMASTER01

On this page you will find documents , package deals, flashcards offered by seller PAPERSMASTER01.With our documents on your side you"ll be well equipped to tackle you exams and achieve the grades you need.

3,9

71 beoordelingen

5
22
4
33
3
9
2
3
1
4

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen