Project Management Test 1 with Complete Solutions

Instelling
Project Management
Vak
Project Management









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Project Management
Vak
Project Management

Documentinformatie

Geüpload op
9 januari 2026
Aantal pagina's
5
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Project Management Test 1 with
Complete Solutions

What are some defining characteristics of projects? - ANSWER-1. An established
objective(goals)
2. A defined life span with a begining and end
3. The involvment of several departments and professionals (Specialized teams for
different tasks)
4.Doing things that hve never been done before(accomplishing someting "new"/unique)
5.Specific time, cost, and performance requirements(these are what evaluations
involve)

what a project is not - ANSWER-not everyday work, not routine, repetitive work.
Projects are done only once!

The project life cycle - ANSWER-Defining stage, planning stage, Executing stage,
Closing stage

Defining Stage - ANSWER-Specifications of the project are otlined,objectives,team
formation, responsibilities assigned

Planning Stage - ANSWER-plans developed to determine what the project will entail,
scheduling, and quality level/budget

Executing stage - ANSWER-Major portions of the work takes place(ie the bridge is
produced) time/cost used for control. Forecast, revisions, changes needed etc.

Closing Stage - ANSWER-delivering the project, redeploying project resources (re-
assigning), and post project reviews(assessing performance etc)

• What reasons account for the increasing importance of Project Management? -
ANSWER-1. Compression of the product life cycle
2. Knowledge explosion
3. Trple bottom line
4. Corporate Downsizing
5. Increased Customer Focus

1. Compression of the product life cycle - ANSWER-(The fast rate of life for new
products ie: xbox-xbox 360 etc NO ROOM FOR ERROR

, 2. Knowledge explosion - ANSWER-(new knowledge expands complexity so the need
for new methods is evident)

3. Trple bottom line - ANSWER-(planet, people, profit- environmental concerns= can't
just focus on profit maximization)

4. Corporate Downsizing - ANSWER-(project management is replacing middle
management- outsourcing is done, and more responsibilities rely on project managers)

5. Increased Customer Focus - ANSWER-(Increased competition= the need for more
value creation-customization for specific needs= closer relationships needed)

The two dimensions of the project management process are - ANSWER-Sociocultural
and Technical

Sociocultural Dimension elements include - ANSWER-Leadership, Problem solving,
Teamwork, Negotiation, Politics, Customer expectation (relationship interactions)

Technical Dimenssion elements include - ANSWER-Scope, WBS, Schedules, Resource
allocation, status reports (functions)

"works well with others" - ANSWER-Refers to the # 1 criterion for CIO's - Strong
communication and interpersonal skills is necessary.

Four activities of the strategic management process - ANSWER-1. Review and define
the organizational mission
2. Set long-range goals and objectives (BASED OFF SWOT
3. Analyze and formulate strategies to reach objectives
4. Implement strategies through projects

SW - ANSWER-internal

OT - ANSWER-external

Bread and butter projects (Top left) - ANSWER-Highly feasible(easy-low value
involve evolutionary improvements to current products and services(software
upgrades/cost reduction efforts)

Pearls(top right) - ANSWER-easy--good profit value
represent commercial advances using technology

oyster(bottom right) - ANSWER-Hard to make (low feasibility) but generate good profit
value

White elephant - ANSWER-low feasibility(hard to make)--low profits

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ALVINK2022 University of Oxford
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
244
Lid sinds
3 jaar
Aantal volgers
157
Documenten
9705
Laatst verkocht
1 week geleden

4,3

83 beoordelingen

5
51
4
17
3
7
2
2
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen