100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Project Management Pretest Exam Questions and Answers

Beoordeling
-
Verkocht
-
Pagina's
8
Cijfer
A+
Geüpload op
09-01-2026
Geschreven in
2025/2026

Project Management Pretest Exam Questions and Answers

Instelling
Project Management
Vak
Project Management









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Project Management
Vak
Project Management

Documentinformatie

Geüpload op
9 januari 2026
Aantal pagina's
8
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Project Management Pretest Exam
Questions and Answers

What is a task? - ANS-A unit of work within a project

The best objectives are SMART. What does SMART stand for? - ANS-Specific,
Measurable, Achievable, Realistic, and related to Time.

Which statement about the benefits of a control system is false? - ANS-Control
identifies opportunities for management's efforts to ensure employee productivity.

Which of the following is a responsibility of a project manager? - ANS-All answer
choices
- Obtain resources
- Build team skills
- Prepare the project plan

Which statement about deliverables is false? - ANS-Deliverables only appear at the end
of a project.

What typically happens if all three cornerstones of project management are not applied?
- ANS-The project is short-circuited or can be stalled.

Which of the following is a top-down budget? - ANS-A budget based on a total cost
management is willing to spend for the project.

What does SWOT stand for when creating a SWOT analysis? - ANS-Strengths,
weaknesses, opportunities, and threats


Mechanics of control systems - ANS-Measurement methods, measurement frequency
and magnitude, authority, feedback.

Prerequisites for control - ANS-Develop a plan, specify organizational responsibility, be
objective and flexible.

Control process steps - ANS-Identify characteristics, set a standard, collect

What is it called when employees with high readiness require little or no oversight while
those with low readiness require just the opposite? - ANS-Situational leadership

, "Getting what you expect" is a good working definition for what? - ANS-Control

During the "measure performance" step of the control process, which of the following is
a measurement standard set by an internal analysis of what is capable? - ANS-
Engineered standards

Why is it important to take the right number of measurements at the right time? - ANS-
You can more easily identify problems and take corrective action.

Which control method focuses on end results? - ANS-Feedback control

What is essential for project managers to effectively delegate? - ANS-Making sure a
team member has the right readiness - Take the time to assess readiness levels as a
prerequisite for delegation.

Which is true regarding project manager participation at meetings? - ANS-Project
managers should be present at all project meetings and play a leadership role.

Which of the following is a reason for a lack of clear project goals? - ANS-Stakeholders
want different deliverables.

Which of the following is ultimately the responsibility of a project manager? - ANS-All
choices
Preparing the project plan
Define the project mission
Set standards for performance

Project manager roles and responsibilities - ANS-Define team mission, prepare project
plan, obtain resources, set standards for performance, delegate duties to project team
members.

Project manager skills and competencies - ANS-Leadership skills, team building skills,
stress management skills, interpersonal skills, administrative skills, business skills.

Project manager challenges - ANS-Lack of authority and power, poor fit for the job,
inadequate resources, lack of clear goals, interdepartmental conflicts, unrealistic
schedules.

Elements of the project team - ANS-Common goals, requirements for mutual support
and assistance, role definition, identification with each other, stability, reward and
recognition.

Responsibility assignment matrix (RAM) - ANS-A matrix that maps the work of a project,
as described in the WBS, to the people responsible for performing the work, as
described in the organizational breakdown structure (OBS)

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ALVINK2022 University of Oxford
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
244
Lid sinds
3 jaar
Aantal volgers
157
Documenten
9705
Laatst verkocht
1 week geleden

4,3

83 beoordelingen

5
51
4
17
3
7
2
2
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen