100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

NBIC PART 1 AND 2 EXAM QUESTIONS AND ANSWERS 100% PASS

Beoordeling
-
Verkocht
-
Pagina's
8
Cijfer
A+
Geüpload op
09-01-2026
Geschreven in
2025/2026

NBIC PART 1 AND 2 EXAM QUESTIONS AND ANSWERS 100% PASS

Instelling
NBIC
Vak
NBIC









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
NBIC
Vak
NBIC

Documentinformatie

Geüpload op
9 januari 2026
Aantal pagina's
8
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

NBIC PART 1 AND 2 EXAM QUESTIONS
AND ANSWERS 100% PASS




An operational test may not be used as the final acceptance of the boiler installation. True or
False? - ANS False, NBIC Part 2 allows an operational test to serve as evidence that the
installation complies with the governing code of construction.


When boilers are connected to a common header, they shall be fitted with two step valves
having an ample free-blow drain between them, for each boiler having a..... - ANS Manhole
(Part 1, 2.7.3)


A steam boiler with a fixed water line that operates at 450 psig is required to have... -
ANS Two direct reading water-gage glasses (NBIC Part 1, 2.8.1)


Austenitic stainless steel steam supply stop valves are permitted in water wetted service. True
or false? - ANS False, NBIC Part 1, 2.7.3 prohibits the use of austenitic stainless steel in water
wetted service.


Prior to initial operation, the completed boiler shall be pressure tested in accordance with the
original code of construction and pressure piping and fittings connected to the boiler when
shipped shall be... - ANS Hydrostatically tested (NBIC part 1, 2.10.2, 1.6.10)


Pressure relief valves shall be connected to the boiler without any unnecessary intervening pipe
or fittings.... - ANS Independent of any connection (NBIC part 1, 2.9.1.2c)




1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

, What type of low-water fuel cutoff is required for an electrode-type electric steam boiler? -
ANS None required (NBIC Part 1, 2.8.5e, no low-water cutoff is required for electrode-type
boilers)


Feedwater other than condensate return shall not be introduced through the blowoff piping.
True or false? - ANS True (NBIC Part 1, 2.5.1.2c)


An economizer that cannot be isolated from the boiler requires a minimum of.... - ANS 0
pressure relief valves, an economizer does not require a pressure relief valve unless the
economizer can be isolated from the boiler.


If there are two egress doors in a 600 sq. Ft. Equipment room, how many remote emergency
shutdown switches will be required? - ANS 2 remote emergency shutdown switches. (NBIC
Part 1, 2.5.3.2b)


A blowdown tank connected to sanitary sewer blowdown water shall be cooled to at least
___________ and the pressure reduced to ___________. - ANS 140F, 5 psig (NBIC Part 1,
3.6.3)


What is the minimum allowed temperature rating of the stop valve or cock for hot-water
heating boiler? - ANS 250F (NBIC part 1, 3.7.5.1d)


What provisions are required to be made for boiler water fill connections? - ANS A means to
prevent back-feeding the service water supply. (NBIC Part 1, 3.5.1b)


An expansion tank installed in a hot-water supply system shall be constructed in accordance
with an applicable code of construction. True or false? - ANS True (NBIC part 1, 3.7.9.1a)


What is the minimum required hydrostatic test pressure of an expansion tank installed in a
closed heating system equipped for a hot-water heating boiler designed with a system pressure
of 25 psig? - ANS 75 psig (In accordance with NBIC Part 1, 3.7.9.1a, if a system is designed for
a working pressure of 30 psig or less, the tank shall be suitably designed for a minimum
hydrostatic test pressure of 75 psig.)


2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Fyndlay Kaplan University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
357
Lid sinds
1 jaar
Aantal volgers
80
Documenten
18669
Laatst verkocht
2 dagen geleden
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3,7

68 beoordelingen

5
32
4
8
3
13
2
6
1
9

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen