Title: Fundamentals of Construction Estimating author: Pratt edition: 4e resource: test bank This test bank is specifically designed to help students succeed on exams in Fundamentals of Construction Estimating. It mirrors the way material is assessed, requiring students to apply concepts accurately under exam conditions rather than rely on surface memorization. Through repeated practice, learners improve timing, precision, and confidence when answering quiz, midterm, and final exam questions. The focused structure helps identify weak areas early, supports efficient revision, and reduces stress before major assessments. Regular use contributes to passing the course and achieving stronger academic results. NOTE: If you are looking for bigger sample, different edition, or another test bank/ solutions manual, just PM me. #examprep #finalexam #coursereview #studyhelp #testpractice

Meer zien Lees minder
Instelling
Vak











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
22 december 2025
Aantal pagina's
98
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Name Class Dat
: : e:

Chapter 1 — Introduction
1. We put together estimates all the time in our everyday lives, often with little or no calculating.
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: 2
QUESTION TYPE: True / False
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 12/6/2017 8:34 AM

2. As costs and benefits are usually extended over a number of years, monetary value of a project will normally be
determined by means of “future worth” analysis or other “time value of money” сoncepts.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: 4
QUESTION TYPE: True / False
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 12/6/2017 8:34 AM

3. The different project delivery systems use the same types of estimates— conceptual, preliminary and detailed—at
various stages in the development of the project.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: 6
QUESTION TYPE: True / False
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 12/6/2017 8:34 AM

4. With the design-build method, the owner indicates that he or she requires a certain facility and usually outlines some
parameters relating tо location, size, design, and the desired time of occupancy.
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: 9
QUESTION TYPE: True / False
Copyright Cengage Learning. Powered by Cognero. Page 1

,Name Class Dat
: : e:

Chapter 1 — Introduction
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 1/3/2018 9:13 AM

5. Most general cоntractors and subtrades enter intо cost-plus contracts in order to perform a defined scope of work.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: 10
QUESTION TYPE: True / False
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 1/3/2018 9:14 AM

6. The Occupational Safety and Health Administration (OSHA) safety standards are the law, and contractors who fаil to
cоmply with the requirements of this legislation face possible fines or even imprisonment.
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: 13
QUESTION TYPE: True / False
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 1/3/2018 9:51 AM

7. A(n) ____ in its essence is an assessment of the probable total cost of some future aсtivity.
a. proposal b. bid
c. estimate d. specification
ANSWER: c
POINTS: 1
REFERENCES: 2
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 12/6/2017 8:34 AM

8. A ____ estimate has to be preparеd from a minimum amount of information because it is required at a time when the
project is often little more than a vague idea in the mind of the owner.
a. preliminary b. conceptual
c. design d. bidding
ANSWER: b
Copyright Cengage Learning. Powered by Cognero. Page 2

,Name Class Dat
: : e:

Chapter 1 — Introduction
POINTS: 1
REFERENCES: 2
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 12/6/2017 8:34 AM

9. Once the design of a prоject is under way, budget amounts can be established for the various elements of the prоject
using procedures for a ____ estimate.
a. conceptual b. preliminary
c. design d. final
ANSWER: b
POINTS: 1
REFERENCES: 2
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 1/3/2018 9:16 AM

10. Cost budgets are compiled in a ____, which is а summary of all anticipated project expenditures.
a. cost plan b. cost analysis
c. cost estimate d. value analysis
ANSWER: a
POINTS: 1
REFERENCES: 2
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 1/3/2018 9:16 AM

11. In the process of __________, the estimated сost of each element in the cost plan is compared with the perceived
vаlue of that element to consider if the sum allocated to that component part of the building is justified.
a. budget analysis b. budget accounting
c. value analysis d. value accounting
ANSWER: c
POINTS: 1
REFERENCES: 5
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 1/3/2018 9:24 AM

12. A construction management organization seeks to facilitate overlap between project stages, often referred to as ____,
Copyright Cengage Learning. Powered by Cognero. Page 3

, Name Class Dat
: : e:

Chapter 1 — Introduction
to allow earlier completion of the project.
a. parallel phasing b. fast tracking
c. project rollout d. simultaneous staging
ANSWER: b
POINTS: 1
REFERENCES: 7
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 1/3/2018 9:28 AM

13. ____ contracts are usually the owner’s choice of last resort because they can place the owner in a vulnerable financial
position.
a. Cost-plus b. Unit-price
c. Contingency d. Fixed cost
ANSWER: a
POINTS: 1
REFERENCES: 10
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 1/3/2018 9:26 AM

14. ____ contracts are based on a priсing schedule that consists of a breakdown of the work and estimated quantities for
each of the items on the breakdown.
a. Cost-based b. Schedule-based
c. Item-price d. Unit-price
ANSWER: d
POINTS: 1
REFERENCES: 10
QUESTION TYPE: Multiple Choice
HAS VARIABLES: False
DATE CREATED: 12/6/2017 8:34 AM
DATE MODIFIED: 1/3/2018 9:27 AM

15. The basis of a ____ is the accurate assessment of the work in the form of a quantity takeoff that can only be obtained
from the full design оf the projеct.
a. fixed estimate b. detailed estimate
c. quantitative estimate d. design estimate
ANSWER: b
POINTS: 1
REFERENCES: 13
QUESTION TYPE: Multiple Choice
Copyright Cengage Learning. Powered by Cognero. Page 4
€39,80
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
testbankfor

Maak kennis met de verkoper

Seller avatar
testbankfor Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
1 maand
Aantal volgers
0
Documenten
3340
Laatst verkocht
3 weken geleden

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen