100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Overig

EXAC (SECTION 1) ALL THEMES STUDY GUIDE

Beoordeling
-
Verkocht
-
Pagina's
13
Geüpload op
26-11-2025
Geschreven in
2025/2026

EXAC (SECTION 1) ALL THEMES STUDY GUIDE

Instelling
EXAC
Vak
EXAC









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
EXAC
Vak
EXAC

Documentinformatie

Geüpload op
26 november 2025
Aantal pagina's
13
Geschreven in
2025/2026
Type
Overig
Persoon
Onbekend

Onderwerpen

Voorbeeld van de inhoud

EXAC (SECTION 1) ALL THEMES STUDY GUIDE


Components of an Architecture Program - Answer -The USERS of the proposed
building and their work activities, including:
-Function by function, room by room, or department by
department activity plans;
-Staffing plans;
-Equipment and storage requirements;
The VOLUME of activity planned for specific facility components, such as:
-flow patterns.

Factors influencing cost - Answer -• Economical and Political
• Functional Programming
• Economical and Political
• Type of Construction Project Delivery
• Building Type/Design
• Characteristics of Owner/Client
• Owners Responsibilities and Timetable
• Other factors:
-Planning regulations, Site development agreement conditions, Onerous bureaucratic
requirements, Hazardous demolition

Describe the physical, cultural and
regulatory factors related to site planning - Answer -- buildings respond to socio-
cultural, economic and political needs
- natural and built environment constraints/offer opportunities for a development
- responsive design respects the indigenous qualities of a place (form/layout of a
building adapts to landscape/sun path/climate)

Main Properties of Structural System - Answer --exterior envelope
-substructure
-interior subdivisions

Describe the Process in DEVELOPING an Architecture Program - Answer -• Describe
clients philosophy, vision and goals
• Describe the services
• Identify how the services will be delivered and/or operational
characteristics
• Identify activities, workload
• Identify the number of people and/or staff required to provide
the services and all other occupants
• Identify major equipment
• Identify relationships between spaces or groups of spaces
• Prepare detailed space requirements

, - a grossing factor multiplier as per the type of user.

Additionally a functional program may include:
• Overall project implementation schedule
• Preliminary financial information and budgets
• Project delivery method
• Site evaluation

Strategies to review/evaluate/implement a client's budget - Answer --prepare a
construction cost estimate
(never guarantee or warranty or it will void liability insurance-)
-establish a cost limit (budget limit)
-develop a cost plan
first one during SD phase, and them multiple checks throughout DD & CD phases until
Bid/Contract is awarded

Site Analysis Items to Consider - Answer -- GROUND SLOPES and subsoil conditions
of a site are required in order to locate areas suitable for construction/outdoor
activities/drainage fields
- Map out existing trees, native plants. Wetlands, streams, watersheds, floodplains etc.
to see which of these can be preserved
- Possible CIRCULATION PATHS for pedestrians and vehicles (and possible
entrances) should be studied through site analysis of flows throughout and around the
site
o IDENTIFY desirable VIEWS/objectionable views
o IDENTIFY potential sources of CONGESTION/NOISE
o Consider existing SCALE/character of neighborhood in relation to the proposed
development
o PROXIMITY to public/commercial/medical/recreational facilities

Substructure - Answer -foundation-provides support and anchor to the superstructure
and transmit the loads safely to the earth.

Analyze the program regarding the site components. - Answer -Site dependent. The
site characteristics can affect the building type (topography, soil conditions, bylaw
restraints etc.)

6 Methods of Cost Estimating - Answer --forecasting based on historical data
-classes of Cost Estimates
Class A,B,C,D
-Elemental Cost
-Area Method
-Volume Method
-Unit Method

Urban design issues and planning processes that

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
QUEENS Harvard University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
222
Lid sinds
3 jaar
Aantal volgers
180
Documenten
4152
Laatst verkocht
2 weken geleden

4,1

61 beoordelingen

5
35
4
10
3
8
2
3
1
5

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen