100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

CESSWI Part 2 NEW 2025/ 2026 Update) Questions & Answers | Grade A| 100% Correct (Verified Solutions)

Beoordeling
-
Verkocht
-
Pagina's
63
Cijfer
A+
Geüpload op
12-11-2025
Geschreven in
2025/2026

CESSWI Part 2 NEW 2025/ 2026 Update) Questions & Answers | Grade A| 100% Correct (Verified Solutions)

Instelling
CESSWI
Vak
CESSWI











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CESSWI
Vak
CESSWI

Documentinformatie

Geüpload op
12 november 2025
Aantal pagina's
63
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

CESSWI Part 2 NEW 2025/ 2026 Update)
Questions & Answers | Grade A| 100%
Correct (Verified Solutions)

Multiple Hat Role
Primary Role - Determine Regulatory Compliance of site
Official Representative On-Site
Fact Finder and Record Keeper
Enforcement Case Developer
Technical Instructor
CESSWI
Certified Erosion, Sediment and StormWater Inspector
Good Inspectors Skills
Inquisitiveness, Thoroughness, Consistency, Integrity, Conflict Resolution, and
Communication
Plan Types
SWPPP, ESCP, Drainage/Grading Plan, SPCC, SWMP
SWPPP
Stormwater Pollution Prevention Plan Plan
ESCP
Erosion and Sediment Control Plan
SPCC
Spill Prevention Control and Countermeasure Plan
SWMP
MS4 Stormwater Management Plan/Program
NPDES Targeted Pollutants
Dredged spoil, solid waste, incinerator residue, filter backwash, sewage, garbage,
sewage sludge, munitions, chemical wastes, biological materials, radioactive
materials, heat, wrenched or discarded equipment, rock, sand, cellar dirt, and
industrial, municipal, and agricultural waste discharged into water
NPDES

,National Pollutant Discharge Elimination System
BMP
Best Management Practices
Description and Purpose
Defines the BMP and its general purpose
Objectives
Lists how the BMP Functions
Targeted Pollutants
The Pollutants it targets
Applications
State Areas/Situation where the BMP should be used
Limitations
States Areas/Situations where the BMP should not be used
Implementations Considerations
Offers information to consider when using this BMP
Inspection
Presents Items to look for when performing inspections on theBMPs
Maintenance
States what items need to be maintained and/or repaired when damage/disrepair is
encountered
Potentially Associated BMPs
List BMPs that may be used in conjunction with the BMP being inspected
What are Best Management Practices?
Site Planning and Management, Erosion Controls, Sediment Controls, Runoff
Controls, Good Housekeeping/Materials Management, Post-Construction
Management
BMP used to plan for Containment, treatment, or other management of pollutants
found on site throughout the lift of the site
Scheduling/Sequencing, Existing Vegetation, Tree protection
Scheduling/Sequencing Description and Purpose
A Temporary, procedural control that involves a written plan to address necessary
BMP and Sequencing of construction activities to mitigate the erosive effects of
wind, water, and construction activity. Scheduling must take into account local
considerations such as rainfall, wind, and soil types
Scheduling/Sequencing Objectives
Site Planning & Management, Erosion Control, Sediment Control
Scheduling/Sequencing Targeted Pollutants

,Sediment
Scheduling/Sequencing Applications
Developing timetable for certain activities (Clearing, grubbing, grading) particularly
during the rainy season
Scheduling/Sequencing Limitations
Not Following Schedule/Sequence
Scheduling/Sequencing Implementation Considerations
Developing timetable for certain activities during rainy season. Written detailed soil
disturbing activities as well as BMPs to control Runoff - must be flexible. Stabilize as
soon as possible - based on area and environmental considerations.
Scheduling/Sequencing Inspections
Scheduling/Sequencing Operations should be inspected, per regulatory inspection
schedule for: Inclusion of Scheduling/Sequencing as a BMP in the Plan/SWPPP;
Scheduled site activities mirroring scheduled activities
Scheduling/Sequencing Mainteancne
Modify the schedule activities when such changes are warranted, Modify the
schedule of activities prior to the rainy season to reflect updated BMP information
Existing Vegetations Description and Purpose
A Temporary or Permanent BMP designated to stabilize soil and to remove
suspended particles from sheet flor runoff
Existing Vegetation Objectives
Site Planning and Management, Erosion Control, Sediment Control, and Post-
Construction Management
Existing Vegetation Targeted Pollutants
Sediment, Nutrients, Hydrocarbons-Petroleum Products, Turbidity
Existing Vegetations Applications
Within the permitted limits, no construction activity, where preservation is required,
where existing vegetation can be used for erosion, sediment and stormwater quality
treatment
Existing Vegetation Limitations
Arid and Semi-arid regions may have little to no Vegetations, The amount of
Vegetation - may be limited by the size of the property, Limited access for
maintenance to protect BMP
Existing Vegetation Implementation Considerations
Existing Vegetation Should be Maintained, wherever possible during construction

Example: Grass, Weeds and Trees

, Existing Vegetations Potentially Associated BMPS
Swales, Riparian Buffer Zone
Erosion Control
BMP used to prevent detachment and transport of Sediment or Rock Fragments by
Water, Wind, or ice.
Erosion Control Examples
Hydromulch, hydroseed, mulching, RECP, Seeding, Sod, Soil Binder, Surface
Roughening, Tackifiers
Hydroseed Description and Purpose
A Temporary or Permanent BMP designed to reduce erosion and runoff by applying a
mixture of seed, fertilizer, and stabilizing emulsion applied with hydraulic equipment
to protect soils from erosive forces of wind and water.
Hydroseed Objectives
Erosion Control, Good-Housekeeping/Materials management, Post Constriction
Management
Hydroseed Targeted Pollutants
Sediment, Nutrients, Metals, PH
Hydroseed Applications
Temporary Stabilizations, Final Stabilizations
Hydroseed Limitations
Seed Mix appropriate for seasonal conditions, time of application per seasonal
conditions, may be difficult on steep slopes, no pedestrian or vehicular traffic, avoid
high winds
Hydroseed Implementation Considerations
Need adequate moisture, additional mulch may be needed, retreatment where
adequate cover is not met, apply from multiple angles to avoid shadowing
Hydroseed Inspection
Inspected per regulation inspection schedule for: Adequate coverage of disturbed
areas - bare areas, shadow areas - from one angle application - signs of pedestrian
or vehicular traffic, signs of animal activity, check seed mix for correct type and
application rate
Hydroseed Maintenance
Reapply in areas of inadequate cover, insure proper moisture, maintain unbroken
coverage throughout the project, require repair due to traffic or animal activity
Hydroseed Potentially Associated BMPs
Hydromulch, seeding, mulching, temporary stabilization, tackifiers
RECP
€20,53
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Bestnursesteve Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
506
Lid sinds
1 jaar
Aantal volgers
63
Documenten
5179
Laatst verkocht
8 uur geleden
TEACH ME TO

TEACH ME TO I HEIP STUDENTS WITH ALL TYPE OF EXAMZ LIKE NGN,ATI,HESI,PN COMPREHENSION., FIREFIGHTER ,ECONOMICS .ENGLISH,SPANISH.MATHEMATICS .......TO SCORE A+ AND ALSO TO ASSIST IN ANY EXAM POSSIBLE

4,8

1506 beoordelingen

5
1354
4
88
3
25
2
11
1
28

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen