100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

VA CONTRACTORS: VA ADVANCED (CLASS A) QUESTIONS WITH CORRECT ANSWERS (VERIFIED)

Beoordeling
-
Verkocht
1
Pagina's
4
Cijfer
A+
Geüpload op
25-10-2025
Geschreven in
2025/2026

1. A lump sum contract on a project has a total contract price of $160,000. Retainage has been held back at 10%. The contractor has received progress payments for 75% of the project. The contractor submits a request for final payment for the new completed project. The final payment amount should be for...: More than $50,000 2. The owner requests for change which will cost the contractor $15,000 in labor and materials and $2,250 in overhead costs. With the change, the contractor would be relieved of $18,000 in labor and materials costs, and $2,400 in overhead costs from the original contract. The original bid included profit of 20% of all costs. The contractor wants to make a profit of 20% of all costs on the changes. The adjusted contract price for the change order should be...: A decrease of $3,780 3. What is the total project overhead for a project that lasts 3 months and has the following costs? Labor is $4,000; materials are $9,500; equipment rentals are $1,200; superintendent's annual salary is $36,000; office rent is $800 per month; and office utilities are $375 per month.: Less than $12,000 4. Which of the following would typically be covered by a contractor's comprehensive general liability insurance policy?: Damage to adjoining property from a crane accident 5. What is the total gross compensation and employment status for a carpenter, given the following information? A contractor hires a carpenter to do the finish work for a 10-home project. The carpenter is to be paid $16 per hour. The contractor provides all materials and equipment, such as a table saw. The carpenter provides all of his own hand tools. The contractor and the carpenter agree that all of the homes are to be completed within 60 8-hour working days, without overtime. The contractor provides the carpenter with a schedule of the order in which homes are to be worked on. The contractor provides a helper to assist the carpenter. The contractor sets the work schedule each day. The carpenter spends 600 hours to complete this project, including 120 hours of overtime.: The carpenter is an employee and is owed $10,560 for the project 6. What is the name of the process when a facilitator meets with the major participants in a project, prior to the commencement of the project, to identify the shared goals of all participants?: Partnering 7. What is the average collection period ratio for a firm that has $365,000 in annual revenues, $6,600 in current receivables, and net income of $32,000?: 6.6 8. Who oversees compliance with Material Safety Data Sheets?: OSHA 9. A non-exempt employee of a contractor covered by the Fair Labor Standards Act works 60 hours during a workweek. The agreement is to pay the employee $400 each week regardless of the numbers of hours worked. What should be the employee's gross pay for the worksheet?: $700.50 10. In the previous year, a company had revenues of $500,000 project overhead of $40,000 and company overhead of $75,000. The company expects the percentage for project and company overhead to remain the same for the current year. The company desires to make a 10% profit on a project it is bidding. The project would have $80,000 in direct costs. What should the bid price be?: Between $110,000 and $120,000

Meer zien Lees minder
Instelling
Va Contractor Hic
Vak
Va Contractor hic








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Va Contractor hic
Vak
Va Contractor hic

Documentinformatie

Geüpload op
25 oktober 2025
Aantal pagina's
4
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

VA CONTRACTORS: VA ADVANCED (CLASS A) QUESTIONS
WITH CORRECT ANSWERS (VERIFIED)

1. A lump sum contract on a project has a total contract price of $160,000. Retainage
has been held back at 10%. The contractor has received progress payments for 75% of
the project. The contractor submits a request for final payment for the new completed
project. The final payment amount should be for...: More than $50,000
2. The owner requests for change which will cost the contractor $15,000 in labor and
materials and $2,250 in overhead costs. With the change, the contractor would be
relieved of $18,000 in labor and materials costs, and $2,400 in overhead costs from the
original contract. The original bid included profit of 20% of all costs. The contractor
wants to make a profit of 20% of all costs on the changes. The adjusted contract price for
the change order should be...: A decrease of $3,780
3. What is the total project overhead for a project that lasts 3 months and has the
following costs? Labor is $4,000; materials are $9,500; equipment rentals are $1,200;
superintendent's annual salary is $36,000; office rent is $800 per month; and office
utilities are $375 per month.: Less than $12,000
4. Which of the following would typically be covered by a contractor's comprehensive
general liability insurance policy?: Damage to adjoining property from a crane
accident
5. What is the total gross compensation and employment status for a carpenter, given the
following information? A contractor hires a carpenter to do the finish work for a 10-
home project. The carpenter is to be paid $16 per hour. The contractor provides all
materials and equipment, such as a table saw. The carpenter provides all of his own
hand tools. The contractor and the carpenter agree that all of the homes are to be
completed within 60 8-hour working days, without overtime. The contractor provides
the carpenter with a schedule of the order in which homes are to be worked on. The
contractor provides a helper to assist the carpenter. The contractor sets the work
schedule each day. The
carpenter spends 600 hours to complete this project, including 120 hours of overtime.:
The carpenter is an employee and is owed $10,560 for the project

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
BrainyManiac Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
21
Lid sinds
2 jaar
Aantal volgers
14
Documenten
735
Laatst verkocht
1 week geleden

4,3

3 beoordelingen

5
1
4
2
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen