100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Information Technology Project Management (9th Edition) – Kathy Schwalbe | Complete Test Bank with Verified Answers

Beoordeling
-
Verkocht
-
Pagina's
472
Cijfer
A+
Geüpload op
21-10-2025
Geschreven in
2025/2026

This document provides the full Test Bank for Information Technology Project Management (9th Edition) by Kathy Schwalbe. It includes verified questions and correct answers with rationales for all 13 chapters. The content covers True/False, Multiple Choice, Completion, and Essay questions based on key topics such as the triple constraint, project life cycles, stakeholder management, PMP certification, and project management methodologies. Ideal for instructors and students preparing for exams or quizzes on IT project management principles and practices.

Meer zien Lees minder
Instelling
Information Technology Project Management
Vak
Information Technology Project Management











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Gekoppeld boek

Geschreven voor

Instelling
Information Technology Project Management
Vak
Information Technology Project Management

Documentinformatie

Geüpload op
21 oktober 2025
Aantal pagina's
472
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

TEST BANK - Information Technology
Project Management, 9th Edition by
Kathy Schwalbe
ALL CHAPTERS 1-13| VERIFIED
QUESTIONS AND CORRECT
ANSWERS WITH RATIONALES
Ar
ch
Do
c




1|Page

, Chapter 1: Introduction to Project Management

TRUE/FALSE

1. Until the 1980s, project management primarily focused on providing schedule and resource data to top
management in the military, computer, and construction industries.

CORRECT ANSWER: T

Until the 1980s, project management primarily focused on providing schedule and resource data to top
management in the military, computer, and construction industries. Today’s project management involves
much more, and people in every industry and every country manage projects.

PTS: 1 DIF: Difficulty: Easy REF: p.2

OBJ: LO: 1-1 NAT: BUSPROG: Technology TOP: Introduction

KEY: Bloom's: Knowledge



2. A difference between operations and projects is that operations end when their objectives have been
Ar

reached, whereas projects do not.

CORRECT ANSWER: F
ch


Projects are different from operations in that they end when their objectives have been reached or the project
has been terminated.
Do


PTS: 1 DIF: Difficulty: Moderate REF: p.4
c

OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?

KEY: Bloom's: Comprehension



3. Every project should have a well-defined objective.

CORRECT ANSWER: T

A project has a unique purpose. Every project should have a well-defined objective.

PTS: 1 DIF: Difficulty: Easy REF: p.6

OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?

KEY: Bloom's: Knowledge




2|Page

,4. Projects should be developed in increments.

CORRECT ANSWER: T

A project is developed using progressive elaboration. Projects are often defined broadly when they begin, and
as time passes, the specific details of the project become clearer. Therefore, projects should be developed in
increments.

PTS: 1 DIF: Difficulty: Moderate REF: p.6

OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?

KEY: Bloom's: Comprehension



5. Resources in a project should be used effectively because they are limited.

CORRECT ANSWER: T

A project requires resources, often from various areas. Resources, however, are limited and must be used
effectively to meet project and other corporate goals.
Ar

PTS: 1 DIF: Difficulty: Moderate REF: p. 7
ch

OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?

KEY: Bloom's: Comprehension
Do


6. A project manager’s primary role is to provide the funding for a project.
c


CORRECT ANSWER: F

A project sponsor usually provides the direction and funding for a project.

PTS: 1 DIF: Difficulty: Easy REF: p.7

OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?

KEY: Bloom's: Knowledge



7. One of the main reasons why project management is challenging is because of the factor of uncertainty.

CORRECT ANSWER: T

A project involves uncertainty. Every project is unique and thus it is sometimes difficult to define its
objectives clearly, estimate how long it will take to complete, or determine how much it will cost. This
uncertainty is one of the main reasons project management is so challenging.


3|Page

, PTS: 1 DIF: Difficulty: Moderate REF: p.7

OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?

KEY: Bloom's: Comprehension



8. Questions about how a team will track schedule performance is related to a project’s scope.

CORRECT ANSWER: F

Project scope deals with questions such as, ―What work will be done as part of the project?‖, ―What unique
product, service, or result does the customer or sponsor expect from the project?‖, or ―How will the scope be
verified?‖

PTS: 1 DIF: Difficulty: Moderate REF: p.7

OBJ: LO: 1-2 NAT: BUSPROG: Technology TOP: What is a Project?

KEY: Bloom's: Comprehension
Ar


9. In order to be realistic, a project manager should always set discrete goals instead of a range of objectives.
ch

CORRECT ANSWER: F

Projects involve uncertainty and limited resources. Thus they rarely finish according to their original scope,
Do

time, and cost goals. Instead of discrete target goals, it is often more realistic to set a range of goals.

PTS: 1 DIF: Difficulty: Moderate REF: p.8
c


OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Project?

KEY: Bloom's: Comprehension



10. Managing the triple constraint primarily involves making trade-offs between resources and quality.

CORRECT ANSWER: F

Managing the triple constraint involves making trade-offs between scope, time, and cost goals for a project.
Experienced project managers know that one must decide which aspect of the triple constraint is most
important.

PTS: 1 DIF: Difficulty: Easy REF: p.9

OBJ: LO: 1-2 NAT: BUSPROG: Analytic TOP: What is a Product?

KEY: Bloom's: Knowledge


4|Page

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TheArchDocElite7Star Stanford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
40
Lid sinds
9 maanden
Aantal volgers
0
Documenten
160
Laatst verkocht
19 uur geleden
The Arch Doc Elite 7 Star

Hello! We're a group of 7 experienced academic professionals specializing in exam preparation, test banks, and assignments. We're your Elite source for A+ GRADED test banks and study materials designed to help you excel academically. Always feel welcome as we partner in your Academics. PLEASE RATE AND WRITE A REVIEW after using our materials. Your reviews will motivate Us add more materials. ALL THE BEST!!!!

4,3

3 beoordelingen

5
2
4
0
3
1
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen