100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!

Beoordeling
-
Verkocht
-
Pagina's
64
Cijfer
A+
Geüpload op
10-10-2025
Geschreven in
2025/2026

Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!

Meer zien Lees minder
Instelling
Oregon Construction Contractors CCB
Vak
Oregon Construction Contractors CCB











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Oregon Construction Contractors CCB
Vak
Oregon Construction Contractors CCB

Documentinformatie

Geüpload op
10 oktober 2025
Aantal pagina's
64
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Oregon Construc on Contractors CCB Test 400
Ques ons and answers Newest RATED A+ 2025/2026
WITH COMPLETE SOLUTION NEW!!

A person who engages in a business or ac vity that involves construc on new water wells must
possess a license from the: - Ans Oregon Water Resource Department (OWRD)



True or False

Prompt billing and prompt collec ons make for a healthier cash flow. - Ans True



Oregon OSHA consultants WILL NOT: - Ans Issue cita ons or propose penal es for viola ons of
OSHA standards.



1) Ques ons to answer when preparing your project schedule include all of these except:



- All of these are ques ons to ask

- What equipment will be needed?

- How long will each task take to complete?

- What type of crew will be needed to complete the ac vity? - Ans - All of these are ques ons to
ask

- What equipment will be needed?

- How long will each task take to complete?

- What type of crew will be needed to complete the ac vity?



For No ce of Right Lien purpose, a commercial improvement is defined as: - Ans A structure
that is not used or intended for use as a residen al building

,I am the residen al original contractor and I provide labor and materials for the project. Who
do I need to give a no ce of Right to Lien to? - Ans Mortgagee



A quan ty survey is also referred to as a: - Ans Take Off



Tagout involves placing a warning tag: - Ans On an energy-isola on device



Other than Take Off, other common construc on es mate types include all, except: - Ans
Ballpark Es mates



True or False

An on-site of host employer is responsible for ensuring a safe place of employment for leased or
temporary workers. - Ans True



The state unemployment tax rate varies base on: - Ans The history of unemployment claims
against the employer.



Stop work order viola ons can result in: - Ans - Any of these could be the result of failure to
comply with a stop work order.

- Court ac on

- Permit or license revoca on

- Civil penal es



The ___________________ gives an overview of the project, deadlines, and general
requirements. - Ans Invita on to Bid



"Job Logic" refers to: - Ans The sequence of work

,True or False

Self-employment taxes apply to all forms of business en es. - Ans False



- Money earned and money spent are accounted for in the year they are received or paid,
respec vely. - Ans In the Cash Method



The Itemized Summary is the basis for: - Ans A complete and accurate es mate of project costs
and lists all major items of work in the order they are to be performed.



A major difference between the EIN and the BIN is: - Ans One is federal and one is state



Poor construc on and storage prac ces can result in _________________ inside the structure
walls. - Ans Molds and fungus



Builders now must use corrosion-resistance flashing in these specified loca ons, except: - Ans
Surrounding all interior bedroom doors.



Compliance with environmental regula ons can protect a contractor from:



- All of these are correct

- Private party lawsuits

- Criminal and civil penal es

- Liability claims - Ans - All of these are correct

- Private party lawsuits

- Criminal and civil penal es

- Liability claims

, Using the Quan ty Take-Off method for es ma ng, you begin by es ma ng the cost of
_________________ for each individual task. - Ans Labor and materials



Contractors must apply for permits through: - Ans Their local building department



A cost effec ve method for managing material costs and keeping inventory costs down is the: -
Ans JIT - Just In Time



These are materials prohibited form open burning in Oregon except for: - Ans Unpainted and
untreated scrap wood



An owner-seller may comply with the Homebuyers Protec on Act (HPA) by:



- Doing any of these

- Purchasing tle insurance that does not exclude filed or unfiled claims of lien,

- Obtaining lien waivers or releases

- Retaining at least 25% of the sales price in escrow - Ans - Doing any of these

- Purchasing tle insurance that does not exclude filed or unfiled claims of lien,

- Obtaining lien waivers or releases

- Retaining at least 25% of the sales price in escrow



What are the possible consequences that a contractor may face if he or she fails to provide the
informa on to the Owner About Construc on Liens when required?



- All of these are correct

- Contractor may be fined
€9,18
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
STUVANA Phoenix University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
47
Lid sinds
6 maanden
Aantal volgers
1
Documenten
3670
Laatst verkocht
23 uur geleden
STUVATE PRO -USA

3,0

5 beoordelingen

5
1
4
0
3
3
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen