Project - Answer an Interrelated set of activities with a definite starting and ending point, which results in a unique outcome for a specific allocation of resources. Project Management - Answer A systemized, phased approach to defining, organizing, planning, monitoring and controlling projects. Program - Answer An interdependent set of projects that have a common strategic purpose. work breakdown structure (WBS) - Answer A statement of all work that has to be completed. activity - Answer The smallest unit of work effort consuming both time and resources that the project manager can schedule and control. network diagram - Answer A network planning method, designed to depict the relationships between activities, that consist of nodes (circles) and arcs (arrows). program evaluation and review technique (PERT) - Answer A network planning method created for the U.S. Navy's Polaris missile project in the 1950's, which involved 3,000 separate contractors and suppliers. Critical Path Method (CPM) - Answer A network planning method developed in the 1950's as a means of scheduling maintenance shutdowns at chemical-processing plants. precedence relationship - Answer A relationship that determines a sequence for undertaking activities; it specifies that one activity cannot start until a preceding activity has been completed. Path - Answer The sequence of activities between a projects start and finish. Critical Path - Answer The sequence of activities between projects start and finish that takes the longest time to complete. earliest finish time (EF) - Answer An activitys earliest stat time plus its estimated duration, t, or EF = ES + t.

Meer zien Lees minder
Instelling
Vak








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
7 oktober 2025
Aantal pagina's
2
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

MGMT 339 CHAPTER 7 PROJECT
MANAGEMENT EXAM AND ACTUAL
ANSWERS.
Project - Answer an Interrelated set of activities with a definite starting and ending point,
which results in a unique outcome for a specific allocation of resources.



Project Management - Answer A systemized, phased approach to defining, organizing,
planning, monitoring and controlling projects.



Program - Answer An interdependent set of projects that have a common strategic purpose.



work breakdown structure (WBS) - Answer A statement of all work that has to be completed.



activity - Answer The smallest unit of work effort consuming both time and resources that the
project manager can schedule and control.



network diagram - Answer A network planning method, designed to depict the relationships
between activities, that consist of nodes (circles) and arcs (arrows).



program evaluation and review technique (PERT) - Answer A network planning method
created for the U.S. Navy's Polaris missile project in the 1950's, which involved 3,000 separate
contractors and suppliers.



Critical Path Method (CPM) - Answer A network planning method developed in the 1950's as a
means of scheduling maintenance shutdowns at chemical-processing plants.



precedence relationship - Answer A relationship that determines a sequence for undertaking
activities; it specifies that one activity cannot start until a preceding activity has been
completed.



Path - Answer The sequence of activities between a projects start and finish.




Critical Path - Answer The sequence of activities between projects start and finish that takes
€10,61
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TestSolver9 Webster University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
756
Lid sinds
2 jaar
Aantal volgers
125
Documenten
24874
Laatst verkocht
2 dagen geleden
TESTSOLVER9 STORE

TOPNOTCH IN LEARNING MATERIALS,(EXAMS,STUDYGUIDES NOTES ,REVIEWS,FLASHCARDS ,ALL SOLVED AND PACKAGED.OUR STORE MAKE YOUR EDUCATION JOURNEY EFFICIENT AND EASY.WE ARE HERE FOR YOU FEEL FREE TO REACH US OUT .

3,6

133 beoordelingen

5
60
4
19
3
22
2
9
1
23

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen