100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

TEST BANK For Information Technology Project Management 9th Edition Kathy Schwalbe, Verified Chapters

Beoordeling
-
Verkocht
-
Pagina's
652
Cijfer
A+
Geüpload op
30-09-2025
Geschreven in
2025/2026

TEST BANK For Information Technology Project Management 9th Edition Kathy Schwalbe, Verified Chapters

Instelling
Information Technology Project Management
Vak
Information Technology Project Management











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Gekoppeld boek

Geschreven voor

Instelling
Information Technology Project Management
Vak
Information Technology Project Management

Documentinformatie

Geüpload op
30 september 2025
Aantal pagina's
652
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

TEST BANK For Information Technology
Project Management 9th Edition
Kathy Schwalbe, Verified Chapters




Page 1 of 652

,True / False

1. Until the 1980s, project management primarily focused on providing schedule and resource data to top
management in the military, computer, and construction industries.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: Until the 1980s, project management primarily focused on providing
schedule and resource data to top management in the military, computer, and
construction industries. Today’s project management involves much more, and
people in every industry and every country manage projects.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.2
LEARNING OBJECTIVES: INFO.SCHW.14.1 - LO: 1-1
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS: Introduction
KEYWORDS: Bloom's: Knowledge


2. A difference between operations and projects is that operations end when their objectives have been
reached, whereas projects do not.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Projects are different from operations in that they end when their
objectives have been reached or the project has been terminated.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.4
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


3. Every project should have a well-defined objective.
a. True




Page 2 of 652

,2



b. False
ANSWER: True
RATIONALE: Feedback: A project has a unique purpose. Every project should have a well-defined
objective.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Knowledge


4. Projects should be developed in increments.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project is developed using progressive elaboration. Projects are often
defined broadly when they begin, and as time passes, the specific details of the
project become clearer. Therefore, projects should be developed in increments.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


5. Resources in a project should be used effectively because they are limited.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project requires resources, often from various areas. Resources,
however, are limited and must be used effectively to meet project and other
corporate goals.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p. 7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


Page 3 of 652

, 3



6. A project fmanager’s fprimary frole fis fto fprovide fthe ffunding ffor fa fproject.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: fA fproject fsponsor fusually fprovides fthe fdirection fand ffunding ffor fa
fproject.
POINTS: 1
DIFFICULTY: Difficulty: fEasy
REFERENCES: p.7
LEARNING fOBJECTIVES: INFO.SCHW.14.2 f- fLO: f1-2
NATIONAL fSTANDARDS: United fStates f- fBUSPROG: fAnalytic
TOPICS: What fis fa fProject?
KEYWORDS: Bloom's: fKnowledge


7. One fof fthe fmain freasons fwhy fproject fmanagement fis fchallenging fis fbecause fof fthe ffactor fof
funcertainty.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: fA fproject finvolves funcertainty. fEvery fproject fis funique fand fthus fit
fis fsometimes fdifficult fto fdefine fits fobjectives fclearly, festimate fhow flong fit
fwill ftake fto fcomplete, for fdetermine fhow fmuch fit fwill fcost. fThis funcertainty
fis fone fof fthe fmain freasons fproject fmanagement fis fso fchallenging.
POINTS: 1
DIFFICULTY: Difficulty: fModerate
REFERENCES: p.7
LEARNING fOBJECTIVES: INFO.SCHW.14.2 f- fLO: f1-2
NATIONAL fSTANDARDS: United fStates f- fBUSPROG: fAnalytic
TOPICS: What fis fa fProject?
KEYWORDS: Bloom's: fComprehension


8. Questions fabout fhow fa fteam fwill ftrack fschedule fperformance fis frelated fto fa fproject’s fscope.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: fProject fscope fdeals fwith fquestions fsuch fas, f“What fwork fwill fbe
fdone fas fpart fof fthe fproject?”, f“What funique fproduct, fservice, for fresult fdoes
fthe fcustomer for fsponsor fexpect ffrom fthe fproject?”, for f“How fwill fthe fscope
fbe fverified?”
POINTS: 1
DIFFICULTY: Difficulty: fModerate
REFERENCES: p.7
LEARNING fOBJECTIVES: INFO.SCHW.14.2 f- fLO: f1-2
Page 3 of 652

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Tush3161 Chamberlain School Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
77
Lid sinds
4 jaar
Aantal volgers
14
Documenten
1894
Laatst verkocht
4 dagen geleden
Nursing Test Banks and Solution manuals

My carefully curated materials are designed to help students study smarter, prepare with confidence, and succeed in their exams. With a strong focus on accuracy and up-to-date content, we ensure that each test bank meets academic standards and supports your educational goals. You can also reach me through jtutor018atgmaildotcom. I am a specialist in NCLEX BOTH RN and PN, also i provide other nursing materials

Lees meer Lees minder
4,9

150 beoordelingen

5
147
4
0
3
1
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen