100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

HIC virginia 2024 Exam Questions with correct Answers

Beoordeling
-
Verkocht
-
Pagina's
4
Cijfer
A+
Geüpload op
07-09-2025
Geschreven in
2025/2026

HIC virginia 2024 Exam Questions with correct Answers

Instelling
HIC Virginia
Vak
HIC virginia








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
HIC virginia
Vak
HIC virginia

Documentinformatie

Geüpload op
7 september 2025
Aantal pagina's
4
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

HIC virginia 2024 Exam Questions with correct
Answers
What is directly affected by the surface and subsurface conditions of the building site? -
✔✔Foundations - While the type and size of a structure will partly determine the type of
foundation, the foundation itself is very much affected by the surface and subsurface conditions
of the building site.

What term is used to describe the act of removing air pockets from setting concrete? -
✔✔Vibrating Concrete - Consolidation is a process that removes air pockets and forces the
concrete into all parts of the forms.

Which of the following is not a part of a masonry arch? - ✔✔Radius

Anchor bolts should be spaced no more than __' apart and no more than __" from the ends of any
plate section or wall corner. Each bolt must extend at least __" into the concrete. - ✔✔6, 12, 7

In Southern Coastal areas, where should the vapor barrier be placed? - ✔✔The exterior of the
wall.

If butt joints occur when applying gypsum panels to wood and steel framing stagger and locate
them as far from the ___ of walls and ceilings as possible. - ✔✔Center

A minimum temperature of ___ should be maintained during gypsum board application. -
✔✔50°F

What is the maximum allowable span for cold-formed steel joists size 800S162-43 loaded with a
live load of 40 PSF and spaced 16 inches OC? - ✔✔13′-5″

What is the recommended spacing at all panel edge and end joints when positioning plywood
subfloor? - ✔✔1/8"

Which of the following is NOT a purpose of wall sheathing? - ✔✔It helps distribute structural
loads that do not fall directly over studs.

What is the minimum clearance between the stopping point of a built-up girder and the masonry
pocket? - ✔✔1/2"

A deck attached to the back of a house is framed with southern pine 2x10s. The joists are 16
inches OC. What is the maximum allowable clear span for the joists supporting this deck? -
✔✔14 feet 0 inches

Openings which provide access to all under-floor spaces through a perimeter wall shall be not
less than inches. - ✔✔16 X 24
€7,95
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
Legitsolutionsstuvia

Maak kennis met de verkoper

Seller avatar
Legitsolutionsstuvia Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
0
Lid sinds
3 maanden
Aantal volgers
0
Documenten
92
Laatst verkocht
-

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen