100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

CDT exam Questions with Correct Answers (solved) verified questions and correct answers latest already graded a+

Beoordeling
-
Verkocht
-
Pagina's
22
Cijfer
A+
Geüpload op
05-09-2025
Geschreven in
2025/2026

CDT exam Questions with Correct Answers (solved) verified questions and correct answers latest already graded a+ CDT exam Questions with Correct Answers (solved) verified questions and correct answers latest already graded a+ CDT exam Questions with Correct Answers (solved) verified questions and correct answers latest already graded a+ CDT exam Questions with Correct Answers (solved) verified questions and correct answers latest already graded a+ CDT exam Questions with Correct Answers (solved) verified questions and correct answers latest already graded a+

Meer zien Lees minder
Instelling
CDT
Vak
CDT










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CDT
Vak
CDT

Documentinformatie

Geüpload op
5 september 2025
Aantal pagina's
22
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

CDT Exam Questions With Correct
nn nn nn nn nn




Answers (Solved) Verified Questions And
nn nn nn nn




Correct Answers 2025-2026 Latest
nn nn nn nn




Already Graded A+nn nn nn

nn
nn

1. nnThe nnmethod nnof nncomputation nnof nnContractor's nnoverhead nnand nnprofits nnfor
nnChange nnOrder nn
nn
prices, nnwhere nnboth nnadditions nnand nndeletions nnare nninvolved, nnis
nnfound nnin nnthe:
nn
a)
nnAgreement.
nn
b) nnConditions nnof nnthe
nnContract.
nn
c) nnDivision

nn01.
nn
d) nnInstructions nnto nnBidders. nn- nnCORRECT nnANSWER-b) nnConditions nnof nnthe
nnContract.
nn
nn
2. nnGeneral nnRequirements nnare
nnpart nnof:
nn
a) nnSupplementary

nnConditions.
nn
b) nnBidding

nnRequirements.
nn
c)
nnSpecifications.


d) nnSummary nnof nnWork. nn- nnCORRECT nn ANSWER-c)
nnSpecifications.
nn

3. nnThe nnthree nnessential nnconsiderations nnin nnthe nnevaluation nnof nna nnproduct nnare: nn
a) Requirements, nnCriteria, nnand nnTests. nn
b) Costs, nnMaintenance, nnand nnInstallation. nn
c) Life nnCycle nnCost, nnInstallation nnCost, nnand nnMaintenance nnCost. nn
d) Case nnstudies, nnFailures, nnand nnProblems. nn- nnCORRECT nnANSWER-a)
nnRequirements, nnCriteria, nnand nnTests. nn
nn
nn
4. nnWhose nnresponsibility nnis nnit nnto nnfurnish nnthe nnShop
nnDrawings?
nn
a) nnThe

nnArchitect/Engineer

, nn
b) nnThe

nnContractor
nn
c) nnThe

nnOwner


d) nnThe nnSubcontractor nn - nn CORRECT nn ANSWER-b) nn The
nnContractor
nn

5. nnThe nndivision nnof nnthe nnWork nnamong nnmultiple nnprime nnContracts nnis
nndescribed nnin:
nn
a) nnInstructions nnto

nnBidders.
nn
b) nnSupplementary

nnConditions.
nn
c) nnDivision
nn01.
nn
d) nnSpecial nnConditions. nn- nnCORRECT nnANSWER-c)
nnDivision nn01.
nn

6. nnDuring nnthe nnProject nnConception nnStage, nnthe nnA/E nnmay nnbe nnretained nnto: nn
a) Develop nnoutline nnspecifications nn
b) Describe nnthe nncharacter nnof nnthe nnmechanical nnsystem nn
c) Prepare nnrenderings nn
d) Assist nnin nnfinancial nnfeasibility nnstudies nn- nnCORRECT nnANSWER-d) nnAssist nnin
nnfinancial nnfeasibility nnstudies nn
nn

7. nnWhat nnis nnthe nnmain nnpurpose nnof nnMasterFormat? nn
a) for nnscheduling, nnvalue nnmanagement, nnrecording nnof nndesign nndata nnand nnmanaging
nncosts. nn

b) used nnduring nnthe nnplanning nnstage nnof nna nnproject. nn
c) to nnorganize nnthe nnProject nnManual, nnreference nnkeynotes nnand nndetailed nncost
nnestimates. nn

d) when nnthere nnis nna nnstandardized nnneed nnfor nninformation nnto nnappear nnupon nneach
nnpage nnof nna nnproject nnmanual. nn- nnCORRECT nnANSWER-c) nnto nnorganize nnthe

nnProject nnManual, nnreference nnkeynotes nnand nndetailed nncost nnestimates. nn
nn

8. nnThe nnperson nnwho nnbecomes nnsecondarily nnliable nnfor nnanother's nndebt nnor
nnperformance nnis nncalled nnthe: nn

a) Guarantee nn
b) Warrantor nn
c) Guarantor nn
d) Warrantee nn- nnCORRECT nnANSWER-c) nnGuarantor nn
nn

9. nnIntegrated nnprojects nnare nndistinguished nnby nnall nnof nnthe nnfollowing nncharacteristics
nnexcept: nn

, a) Development nnof nnvirtual nnproject nnmodel nnthrough nninput nnfrom nna nncollaborative
nnteam nn

b) Trust-based nncollaboration nnbetween nnproject nnteam nnmembers nn
c) Maximized nnefficiency nnthrough nndesign, nnfabrication, nnand nnconstruction nn
d) "Just nnas nnneeded" nnteam nninvolvement nnto nnreduce nnowner's nnpre-construction
nnexpenses nn- nnCORRECT nnANSWER-d) nn"Just nnas nnneeded" nnteam nninvolvement nnto

nnreduce nnowner's nnpreconstruction nnexpenses nn
nn
nn
10. nnOutline nnSpecifications nnare nnwritten
nnfor
nn
a) nnonly nnDivisions nn02-14 nnwhere nnactual nnproducts nnare
nndiscussed
nn

nn
b) nnDivisions nn01-
49
c) nnonly nnDivisions nn01-14 nn(excluding nnmechanical nnand
nnelectrical)


d) nnthe nnexclusive nnuse nnof nnthe nnA/E nn- nnCORRECT nnANSWER-b)
nnDivisions nn01-49
nn

11. nnAn nnexample nnof nna nnMasterFormat nnLevel nn3 nnspecification nnSection nnis: nn
a) 05 nn00 nn00 nnMetals. nn
b) 05 nn20 nn00 nnMetal nnJoists. nn
c) 05 nn21 nn00 nnSteel nnJoist nnFraming. nn
d) 05 nn21 nn19 nnOpen nnWeb nnSteel nnJoist nnFraming. nn- nnCORRECT nnANSWER-d) nn05 nn21
nn19 nnOpen nnWeb nnSteel nnJoist nnFraming. nn
nn

12. nnWhat nnactivities nntake nnplace nnin nnthe nnProject nnConception nnStage? nn
a) The nnengineers nndevelop nnthe nnmechanical nnand nnelectrical nnsystems. nn
b) The nnsite nnis nnselected nnand nnthe nndemolition nnis nndone. nn
c) Feasibility nnstudies nnand nnbudget nnis nnset. nn
d) The nnprogram nnis nnevaluated nnand nnthe nnengineers nnare nnselected. nn- nnCORRECT
nnANSWER-c) nnFeasibility nnstudies nnand nnbudget nnis nnset. nn
nn

13. nnThe nndocument nnrecommended nnto nnorganize nnpreliminary nn construction
nninformation nninto nna nn
nn
standard nnorder nnon nnthe nnbasis nnof nnsystems nnand
nnassemblies nnis:
nn
a)
nnMasterFormat
nn
b)
nnUniformat
nn
c) nnOutline

nnSpecifications


d) nnProject nnManual nn- nnCORRECT nnANSWER-b)
nnUniformat
€10,10
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ACADEMICSUCCESS stuvia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
44
Lid sinds
9 maanden
Aantal volgers
3
Documenten
5076
Laatst verkocht
1 week geleden
STUDY HUB

WELCOME TO MY STUDY HUB ! I CREAT CLEAR CONCISE, AND EXAM-FOCUSED NOTES DESIGNED TO SAVE YOUR TIME AND BOOST YOUR GRADES .EVERY DOCUMENT IS CRAFTED FROM VERIFIED COURSE MATERIALS , STRUCTURED FOR EASY UNDERSTANDING, AND OPTIMIZED FOR QUICK REVISION . IF YOU WANT RELIABLE ,HIGH QUALITY RESOURCES THAT ACTUALLY HELP YOU SCORE HIGHER , YOU'RE IN THE RIGHT PLACE !"

4,3

24 beoordelingen

5
18
4
2
3
0
2
1
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen